Browse Forums Building A New House Re: Building with mojo homes 39Aug 06, 2017 10:06 pm Nabrolkellyville ja-mez Thats awesome!! Are you getting fancy stairs done? Thought they do stairs prior to lining.. no Fancy stairs for us mate. The free standing option was crazy expensive (around 25k)! We are better off spending that money on driveway and landscaping. You are right they usually do stairs before lining but in our case we have reached lockout and still no stairs! The SS is trying to get them in earlier instead of the scheduled 17th august. I can see your house is coming along quite well. What stage are you at right now? Have you got any quotes yet for things like fencing, driveway and landscaping? Handful of defects/incomplete works mean i probably wont get to lining by september. We have 4 weeks in august but theres 2- 3 weeks in exterior works and theres a couple issues which means that the scaffold wont come down so the lower roof wont get done. Knock on effect. No linings or electrical rough in until this is all closed out! Hoping our stairs go in early on as our tiles are huge. Be a nightmare taking that up a ladder! Havent had landscaping quotes as I'll be doing that myself. I find landscapers so hit and miss. You see ones worth every dollar and others that should stick to digging holes. Driveway my brother inlaw is a concrete so as you can imagine I'll be calling in a favour Is anyone building with Mojo and have a recent site cost tender 0 15951 Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13161 Hi, We are looking for a builder that can build a small home (smaller length) on a sloping site. We came across Mojo's Zephyr design 10.6 m wide and 11.5 m length. Does… 0 23014 |