Browse Forums Building A New House Re: Slab pour help and advice 4Sep 01, 2016 9:12 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Slab pour help and advice 7Sep 02, 2016 7:52 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Versaloc is a mortarless besser block system that still needs a properly engineered footing. If you just do a 400x200 footing it will fail in time. At 17m long you need it… 1 14572 Yes, unless you are in a low intensity rainfall area or the area is protected from rain. Do you have access to NCC Part 2 or can you download it? I can email you a copy… 10 12345 Firstly the ableflex that has been installed needs (manufactures specification) a sealant cap over the top, preventing water draining down between the slab and the… 3 7712 |