Browse Forums Building A New House Re: Footpath damage during construction, please advise 4Aug 22, 2016 9:07 pm ~Shellby~ GJ Bridgewater 203 11/3/2016 - Site Work Started 29/9/2016 - Handover 142 Work Days 6 Work Days Over https://forum.homeone.com.au/viewtopic.php?f=31&t=80174 Re: Footpath damage during construction, please advise 8Aug 23, 2016 6:49 am Our Custom Dale Alcock build in the Village at Wellard https://forum.homeone.com.au/viewtopic.php?f=31&t=78620 Re: Footpath damaged, Water Meter Stolen during construction 14Aug 25, 2016 10:54 am lilyzhou And someone broke in our house, the gas cooker and the oven have been stolen. SS said someone forgot to lock the sliding door. By the way, anyone got idea how I can deal with the sand? We have landscape package, but they require us to level the sand below the ground 30mm. Thanks. Sorry to hear about the break in. The loss should be covered by the builder as your home is not yet delivered. Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71807 1 62023 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20176 |