Browse Forums Building A New House Re: Footpath damage during construction, please advise 4Aug 22, 2016 9:07 pm ~Shellby~ GJ Bridgewater 203 11/3/2016 - Site Work Started 29/9/2016 - Handover 142 Work Days 6 Work Days Over https://forum.homeone.com.au/viewtopic.php?f=31&t=80174 Re: Footpath damage during construction, please advise 8Aug 23, 2016 6:49 am Our Custom Dale Alcock build in the Village at Wellard https://forum.homeone.com.au/viewtopic.php?f=31&t=78620 Re: Footpath damaged, Water Meter Stolen during construction 11Aug 24, 2016 11:14 pm me786 Surprise after surprise! Water Meter Stolen!! Builder said we have to pay for the new meter I think the house is still under builders possession so they should be liable for any stealing or damage. Very stressful situation. I have called the Shire and lodged a ticket regarding the Kerb damage. Awaiting for their response. It's pretty much always your responsibility if a water metre is stolen and unfortunately it happens a lot. I built with CL and would urge you to read your contract word.for.word. it's all in there. Re: Footpath damaged, Water Meter Stolen during construction 12Aug 25, 2016 12:42 am I'm building with CL as well, and just received the final invoice. They credited back the edge protection and earth work costs. I did not expect I could get it back as I had checked our kerb, there was a crack. But I've checked the whole street, every house got a crack kerb including a vacant land.
Re: Footpath damaged, Water Meter Stolen during construction 13Aug 25, 2016 12:44 am And someone broke in our house, the gas cooker and the oven have been stolen. SS said someone forgot to lock the sliding door. By the way, anyone got idea how I can deal with the sand? We have landscape package, but they require us to level the sand below the ground 30mm. Thanks. Re: Footpath damaged, Water Meter Stolen during construction 14Aug 25, 2016 10:54 am lilyzhou And someone broke in our house, the gas cooker and the oven have been stolen. SS said someone forgot to lock the sliding door. By the way, anyone got idea how I can deal with the sand? We have landscape package, but they require us to level the sand below the ground 30mm. Thanks. Sorry to hear about the break in. The loss should be covered by the builder as your home is not yet delivered. Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71811 1 62023 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20181 |