Browse Forums Building A New House 1 Aug 28, 2018 9:59 pm Hi guys, my partner and I have recently purchased land at Huntlee in NSW. I am currently studying a diploma of interior design and my partner is an electrician and supervisor/operator in the mines. We are looking to build the Lisbon 25 with Coral Homes. This house design was chosen for a number of reasons including, the media and loungeroom are close to each other (if we have children the media room will turn into the playroom), the main bedroom has a good sized WIR, the ensuite has a large shower and will include double shower heads, the ensuite is open to the master but the toilet and shower aren’t in direct view, the other bedrooms are close to the master (future kidlets), the toilet is seperate to the main bathroom, walk in pantry and two linen cupboards 🙌🏻 The process has only just started as we paid for soil testing and locked in some special offers on Sunday 26/08/18. The soil testing results should be back within the next three weeks. We are excited to venture into this journey and want to share our experience in the hope that it helps other first home builders. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Lisbon 25 Coral Home’s Huntlee NSW 2Aug 29, 2018 8:09 am jthompson Hi guys, my partner and I have recently purchased land at Huntlee in NSW. I am currently studying a diploma of interior design and my partner is an electrician and supervisor/operator in the mines. We are looking to build the Lisbon 25 with Coral Homes. This house design was chosen for a number of reasons including, the media and loungeroom are close to each other (if we have children the media room will turn into the playroom), the main bedroom has a good sized WIR, the ensuite has a large shower and will include double shower heads, the ensuite is open to the master but the toilet and shower aren’t in direct view, the other bedrooms are close to the master (future kidlets), the toilet is seperate to the main bathroom, walk in pantry and two linen cupboards 🙌🏻 The process has only just started as we paid for soil testing and locked in some special offers on Sunday 26/08/18. The soil testing results should be back within the next three weeks. We are excited to venture into this journey and want to share our experience in the hope that it helps other first home builders. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Congratulations, looking forward to watching the build. Re: Lisbon 25 Coral Home’s Huntlee NSW 3Aug 29, 2018 8:14 am Great choice, I am currently awaiting council approval for building the Lisbon 25 in QLD. Look forward to following your build. Re: Lisbon 25 Coral Home’s Huntlee NSW 4Aug 29, 2018 9:52 am Congratulations!! Lovely house. Saw the display at North Harbour. Re: Lisbon 25 Coral Home’s Huntlee NSW 5Aug 29, 2018 10:36 am GarethB Great choice, I am currently awaiting council approval for building the Lisbon 25 in QLD. Look forward to following your build. So exciting! We will enjoy being able to follow your build 😊 Re: Lisbon 25 Coral Home’s Huntlee NSW 7Aug 29, 2018 10:45 am mpricecs jthompson Hi guys, my partner and I have recently purchased land at Huntlee in NSW. I am currently studying a diploma of interior design and my partner is an electrician and supervisor/operator in the mines. We are looking to build the Lisbon 25 with Coral Homes. This house design was chosen for a number of reasons including, the media and loungeroom are close to each other (if we have children the media room will turn into the playroom), the main bedroom has a good sized WIR, the ensuite has a large shower and will include double shower heads, the ensuite is open to the master but the toilet and shower aren’t in direct view, the other bedrooms are close to the master (future kidlets), the toilet is seperate to the main bathroom, walk in pantry and two linen cupboards 🙌🏻 The process has only just started as we paid for soil testing and locked in some special offers on Sunday 26/08/18. The soil testing results should be back within the next three weeks. We are excited to venture into this journey and want to share our experience in the hope that it helps other first home builders. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Congratulations, looking forward to watching the build. Thank you! 😊 Re: Lisbon 25 Coral Home’s Huntlee NSW 8Aug 29, 2018 10:52 am jthompson bestspecials Congratulations!! Lovely house. Saw the display at North Harbour. Thank you, we actually haven’t walked through it so it’s great to hear that you liked it 😊 We just finished building the Grange 25 in Qld. Re: Lisbon 25 Coral Home’s Huntlee NSW 9Feb 12, 2019 6:50 am Cool, great house, here is the virtual tour for ur house, but in the size 31 https://my.matterport.com/show/?m=WA73UUgJfYq Helps inspire on how to design after the build. We r building near u at Pokolbin, coral homes, cloncurry design In Qld it is a requirement that a builder must have a cost breakdown, for building a home to the same specification, with the same inclusions and the same finish. So ask… 1 4357 having built on acres several times i suggest that you also need to add the cost of a sewerage system and any associated fencing, water tanks with associated extra… 2 1111 Ask the council if there is a chance of getting build over easement exemption. Sometimes easements are unused and 24cm is not all that much. Good luck. And yes any builder… 2 13781 |