UMBRA Estate Greenvale
Page 2 of 4
Our settlement was Tuesday and title changed yesterday.
We are now waiting for soil report, energy assessment and permit. Hopefully we are only looking at about 4 weeks before any action on our land.
It is getting close! I think there will be people in stage 1 by easter!
Did you have to pay the Infrastructure Levy ($733) to Hume council.
Thanks, Just did!
Metricon call me today to tell me of this one off 'payment'. So, all I have left is to wait for the final Metricon house drafting drawings and the final sign off on our inside colours. The drawings will be the ones that will be submitted to Hume for a building permits.
Did you have any/many issues with your home and the developer guidelines?
We had to extend the front of the house as it was only 600mm in front of the garage not the 1000mm that they wanted. 2400mm was the standard size of the bottom floor roof height, we needed to raise to meet the 2550mm requirements. They were the biggest changes that we need to do to meet the requirements.
I think we have done well buying when we did.
Do you know your soil test results. We have a P, so will require a H2 level Engineered stiffened slab.I am trying to work out what that means. A raft slab, Waffle pod with extra beams or Waffle pod with piers. I don't know?
Possibly piers if it is bad enough. I t will be interesting if the specs for us will be the same or not. When I find out I will let you know.
We have fixed site costs as well.
How are things?
Drove past the blocks today and lot 253 & 254 have their builders temp fencing up (first in stage 2). The park is taking shape, the developer has installed all the nature strip trees. There is also a new wooden boundary fence for block lots 228 & 227 with some freshly installed instant turf. The estate is really coming together. Have you been past lately?
2 or 3 homes in stage one have the builders temporary fences down, so it wouldn't be long before the estate has their first residents.
The temp fencing must have gone up yesterday as I was there on Monday.
I did see a a truck arrive while I was there with a load of timber. That would have been the fencing for lots 227 and 228.
I only received my design panel approval yesterday. They did come back at me to clarify the transparency of my front fence and the percentage of garden bed. Fortunately nothing on the actual house.
Now its sit and wait. Hoping to get some action before May?
I will go and have another look on Friday.
We received our building permit today so we are all set to go. Hoping we get lucky and Henley start at the end of the month.
Been a long wait.
I believe the original landowners have either the block you mentioned or the one next door. If the fellas name was Gerald I think that would be him. I wanted one of the 2 large blocks facing the wetlands but they got first pickings of course as part of the sale.
Are you getting a independent building inspector for your build?