Browse Forums Building A New House Re: Aegean 430 from mainvue - lockup stage pics added 81Jun 30, 2016 9:20 am Window looks awesome...will be a real feature! I wish I could have done the same but M advised the window could only be so long so I have about 600mm on either side with a return which I've tiled. By the way, loved the white kitchen option with marble island with 100mm (?) stone! If only I had the money to do that:-) J My Phoenix by Metricon in Melbourne viewtopic.php?f=31&t=83584&p=1570829&hilit=my+phoenix+by+metricon+in+melbourne#p1570829 Aegean 430 from mainvue - lockup stage pics added 85Jul 08, 2016 11:35 pm Been really busy with other things - so far plaster work is finished, while house including upstairs is square set. Staircase has been partially installed and assuming the fixing carpenter will be back next week. On a good note, rear fencing has been put up just need to paint it in monument or domino. Unsure which one to pick Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Aegean 430 from mainvue - lockup stage pics added 87Jul 10, 2016 11:25 am Your build is charging along...not a few weeks ago we were at about the same point and I am without bricks or plaster or staircase...good on you! My Phoenix by Metricon in Melbourne viewtopic.php?f=31&t=83584&p=1570829&hilit=my+phoenix+by+metricon+in+melbourne#p1570829 Re: Aegean 430 from mainvue - lockup stage pics added 91Jul 16, 2016 9:37 pm The view out of your window looks great. I'll be looking forward to seeing the stone as well Aegean 430 from mainvue - lockup stage pics added 92Jul 22, 2016 8:57 pm Few pics from today. Powder room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Ensuite shower with feature tile Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Laundry Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Aegean 430 from mainvue - lockup stage pics added 93Jul 29, 2016 4:51 pm Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Just purchased the tiles for down stairs which will be installed after handover and put a deposit on the kitchen appliances - Miele oven, induction cooktop and integrated dishwasher. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Aegean 430 from mainvue - lockup stage pics added 94Aug 03, 2016 5:03 pm Hi narrewarren01, Lovely your build. May I know 1) why you swap study and theatre? 2) size and price of entry door 3) did you increase the ceiling height 4) how's the experience with MainVue during admin and building? 5) Do you have Cosham catalog? Thanks Re: Aegean 430 from mainvue - lockup stage pics added 95Aug 03, 2016 7:23 pm Hi vintay 1 don't think a theatre room is suited at the front of the home. Plus with kids there closer to watch 2 doors 2.4x1.2 was about 3k I think 3 ceiling heights are 2.7m ground floor and 2.5m 4 all the top 5 builders are similar. Just pick a floor plan your happy with and just go for it 5 I do somewhere but you can get a copy via the sales office I think Re: Aegean 430 from mainvue - lockup stage pics added 96Aug 03, 2016 7:43 pm Narrewarren01 Hi vintay 1 don't think a theatre room is suited at the front of the home. Plus with kids there closer to watch 2 doors 2.4x1.2 was about 3k I think 3 ceiling heights are 2.7m ground floor and 2.5m 4 all the top 5 builders are similar. Just pick a floor plan your happy with and just go for it 5 I do somewhere but you can get a copy via the sales office I think Thanks. Have enquire around but seems like the top 5 builder are not quite willing to change. Have spoken to mainvue, feels like they are open to changes. How's your admin and building stages? Smooth flowing? The sales office don't have the catalogue for Cosham. Re: Aegean 430 from mainvue - lockup stage pics added 99Aug 21, 2016 11:37 am Love the fireplace- where are you putting it? Did you have a provision in your contract for this as I understand they can be difficult to retrofit post handover for doubles especially? Thanks J My Phoenix by Metricon in Melbourne viewtopic.php?f=31&t=83584&p=1570829&hilit=my+phoenix+by+metricon+in+melbourne#p1570829 Aegean 430 from mainvue - lockup stage pics added 100Aug 21, 2016 11:39 am One in each living area. Provisions are there just need to box it out and connect Not unless you have managed to put it as a special condition into the contract somehow. 1 6155 The fastest thing a builder will do is bank your cheque, those systems work perfectly with lightning speed, everything else is slow burn. Just the way it is. 1 8706 1 4695 |