Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
Browse Forums Building A New House Re: Mainvue 47sq double - frame stage 22May 17, 2016 3:25 pm Wow your house is going to be big by the looks of things, your Outdoor inspo pics looks great too. Best of luck, I'll be following! viewtopic.php?f=31&t=81627&p=1505759#p1505759 Aegean 430 from mainvue - pic heavy frame stage 27May 21, 2016 1:44 pm At the pace there going hoping within 5 months. Unfortunately would still have a lot to do after handover Re: Aegean 430 from mainvue - pic heavy frame stage 30May 23, 2016 3:05 am Front door will be as below 2.4x1.2 pivot door stained finish Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ In the family room we have installed a gas point. The display had a jet master fireplace pictured below which I don't really like having the tv to the side Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ So going to install something like this after handover. Mezzo series 1600 mounted on the stone hub Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Aegean 430 from mainvue - pic heavy frame stage 31May 23, 2016 11:11 pm Went past today and the roof was just finishing up. Didn't know but this facade will have a high ceiling under the porch area. Nearly 2.9m once decking is installed Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Also have finalised how I'm concreting behind the garage and around the house Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Aegean 430 from mainvue - pic heavy frame stage 35Jun 05, 2016 11:58 am Moving along fairly good considering the weather. Colorbond Roofing, anticon blanket and valleys has been completed. I believe Windows will be delivered and installed this week inc wall wrap. Aegean 430 from mainvue - lockup stage pics added 37Jun 06, 2016 1:52 pm Took some pics today
Front view - surfmist roof with 600 eaves Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Side / rear Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Garage roof Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Kitchen window Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Study and theatre room flipped Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Rear section of the house Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Aegean 430 from mainvue - lockup stage pics added 38Jun 11, 2016 2:06 pm Lockup has started - in no particular order the following things are getting done. Heating and aircon, duct work, rough in for plumbing. Windows, external doors, and bricks delivered. Temporary Front door - 2400x1200 Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Laundry and front entry frame Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Alfresco sliding door frames x2. Behind that is the study window Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Here we have - top 3 windows are the facade Windows in the master. Large one on the ground is above the bedhead while the other goes in the WIR Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ brick colour - Beachwood Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Aegean 430 from mainvue - lockup stage pics added 40Jun 12, 2016 10:08 pm Walking around the building would be far more satisfying than standing on a mound of dirt like we were doing today lol. I love that kitchen window. Wished we built a double story. We're settling for a mirror splash back which might have to be done post handover. Is anyone thinking of doing the same? Not unless you have managed to put it as a special condition into the contract somehow. 1 6155 The fastest thing a builder will do is bank your cheque, those systems work perfectly with lightning speed, everything else is slow burn. Just the way it is. 1 8707 1 4695 |