GJ Gardner - Mandalay 298 - QLD
Page 1 of 19
Background
House design: GJ Gardner - Mandalay 298 with some modification bringing it to 303m2
Land: 2470m2 - H1 soil - backs on to reserve - 99m left side, 76m right side, 28m width, 36m rear fence
Preliminary deposit paid: 14 April 2016
Preliminary plans provided: 22 April 2016, amendments made 27 April 2016
Old house settled: 16 May 2016
Final quote and drawings drawn up: 15 May 2016
Land settled: 30 May 2016
Colours consultant: 15 June 2016 - Appointment 1 - exterior side of things; 2nd appointment 1 July 2016
Contract: Received 23 June 2016 - signed, sealed & delivered to bank 1 July 2016 (hold up was because it wasn't signed when first given to bank - they requested it signed); new contract (minus solar system) signed and delivered to broker 19 July 2016 at 5pm
Valuation: received 11 July - lower than needed but sorted (removed solar system from contract); amended valuation/finance approved unconditionally 1 August 2016 (a long wait!)
Council approval: into council 26 July 2016; all approved 18 August 2016
Start date: fill and level 19 August 2016
Slab poured: 26 August 2016
Wall frames: 31 August 2016
Roof trusses: 1 September 2016
Roof on: sheeting started 9 September 2016; completed 15 September
Windows installed: 9 September 2016
Bricks: started 19 September 2016; completed 29 September 2016
Electrical fit-out: rough in 16th September; start fit-out 23 November 2016; finshed _________
Plumbing: 14-15th September 2016;
Plastering: started 22 September 2016; completed 29 September 2016 (not skirting); shed lining 5/12/2016
Kitchen: cabinets 6 October 2016; stone-tops 13 October 2016 (pantry sink incorrect 13/10/16 - installed above mount, should be under mount - pantry sink fixed 17/10/16); fit-out finished ______________; BBQ cabinets and BBQ installed 12 December 2016
Bathrooms: cabinets 6 October 2016; stone-tops 13 October 2016; wall tiling started 4 November 2016 (more tiles needed to complete); fit-out finished ______________
Flooring - timber: finished5 December 2016
Flooring - tiling: started 18 October 2016; no work from 19-26 Oct; restarted tiling 1 November 2016;
Painting: started 11 November 2016; finished 19 November 2016
Pool installed: started 17 October 2016; concrete pour 20/10/16;
Septic/Effluent system installed: started 26 October 2016; finished 27 October 2016; drainage completed 28 October 2016
Shed installed: slab poured 8 November 2016; completed 17 November 2016
Driveway 279m2 installed: Half poured 12 December 2016
Courtyard slab installed: poured 4 November 2016
Pool decking installed: 10 December 2016
All outdoor areas tiled:
Handover:
Landscaping completed:
Inclusions we're currently negotiating:
* we're keeping the Classic facade - brick with colorbond roof
* Award series inclusions
* H class foundations allowance
* ducted air-con 16kw Daikin
* concrete inground pool 9x4.5m rectangular shape with full length bench
* 9.4m x 12m shed with 3.6x3m centre door, 3.1x2.7m side doors
* 5kw solar (REC panels and SunnyBoy inverter) - taken out of contract - will install after settlement
* raised ceiling to 2550mm (3400mm in foyer)
* added porch from roofline
* security screens/doors (crimsafe to front door) and changes to window sizes and configurations
* replace all carpet to wooden floorboards (French Oak Inovar laminate)
* raised slab 200mm
* waterfall feature to kitchen island bench - caserstone 20mm
* tiling alfresco area - also slab under eaves on one side (pool side)
* massive driveway to rear shed (approx 270m2 - 3.5x55m + 5x9m in front of shed)
* aggregate driveway to garage and porch
* porch tiled
* freestanding bath with floor tap - ensuite
* raise garage panel door to 2200mm
* concrete courtyard area
* niche in showers
* laundry overhead cupboards
* heaps of extra double powerpoints
* extra TV points - including pool area, alfresco and courtyard
* fans x 7 plus alfresco
* tinted windows - extra dark on western windows, light grey elsewhere - no tint on sliding doors to courtyard and alfresco
* extra taps x 6 (8 total)
* extra external double powerpoints (8 total)
* extra 800mm wall to study
* tap provision for fridge
* wall cabinets in ensuite, main bath and powder room - no extra charge
* Fuji septic system - town water and power but not sewage
* extra downlights and pendant lighting in foyer (2 - 1 large, 1 medium) and above kitchen bench (3 small)
* sales consultant is 'throwing in' upgrade to LED lights, soft close drawers in kitchen and double bin under sink
Extras added on later:
* exposed aggregate (eclipse) path from garage to pool area (originally only to clothesline)
* concrete courtyard and outdoor tiles laid
* exposed aggregate around pool area (eclipse)
* changed pool layout and size - now 8.5m x 5m and changed orientation
* plaster half of the shed to 2.4m with insulation - me to paint
* French Oak laminate flooring to 1/3 of shed (man cave / workbench part)
* overlap fence palings to existing fence and run sleepers along the bottom
* extra electrical fittings - ie. TV/antenna to shed; TV to kids' rooms; dimlight to alfresco (4 lights); change spotlights; extra powerpoints
* change butler's pantry to include wrap around bench and cupboards. Cupboards are stylelite gloss white (very shiny)
* no handles to stylelite overhead cupboards
* rain style shower head from ceiling as well as shower rail (square)
* Webber built-in BBQ with rangehood and mocha 300x600 ultra gloss backsplash
* water tank cement pad
* 6.2m x 3.2m garden shed cement pad
* 3 x whirley birds on house and 3 x whirley birds on shed
*
In the next few weeks we're expecting (hoping) the following will happen:
* our house settle - 16 May 2016
* land settle - before 30 May 2016
* floor plan and colours selected
* final contracts drawn up and signed
* finance approved (valuation of contract endorsed)
* plans submitted to council and approval within 3 weeks from submission (ideal world!)
* on track for pre-Christmas handover!
I can vouch that the sales consultant has been very patient, quick to respond and quite transparent throughout our back and forth communications. I hope the high level of service continues. I know we're right at the beginning stages, but I'm already wishing it was April 2017!
Below is a standard floor plan of the Mandalay 298
Cheers
It's also good to see a few GJ builds popping up around here.
Looking forward to following your build.
Can't wait to follow your progress. I am doing a GJ 249sqm design in Townsville, Iv just started my thread.
Below is a photo of our land - left fence (aged timber) is 99m long and right fence (fresh timber) is 76m long. Block is 28m wide. We're coming in 3-3.5m from the left, which should leave approx 10m on the right. Standard 6m set-back (in line with the other houses).
We do have a tree covenant at the rear of the block - most trees are basically on the rear fence line. Quite a few of the shrubs and a few other trees outside of the covenant will be cleared to make way for the shed, etc.
And here is a layout image of the proposed plan to scale on the land. Including the fire pit at the rear! 3x6m garden shed behind main shed plus water tank sometime in the future.
Nice choice on the house, we are building with GJ also but we are building the Stillwater 231 (Modified). Waiting for our final plans to come through and then we will start our own build thread! Look forward to following your build!
- Ads
Loving this design, wish we had the cash to complete something like this. The WIR's to the bedrooms is a great idea.
Can't wait to follow your progress. I am doing a GJ 249sqm design in Townsville, Iv just started my thread.
Can't wait to follow your progress. I am doing a GJ 249sqm design in Townsville, Iv just started my thread.
Thanks townsvillebuyer, I was reading your build thread earlier today - looks like you're on to a fantastic property too.
Hey Hazza!
Nice choice on the house, we are building with GJ also but we are building the Stillwater 231 (Modified). Waiting for our final plans to come through and then we will start our own build thread! Look forward to following your build!
- Ads
Nice choice on the house, we are building with GJ also but we are building the Stillwater 231 (Modified). Waiting for our final plans to come through and then we will start our own build thread! Look forward to following your build!
- Ads
Awesome Ads. Best of luck with your build. I'll be keeping an eye on other builds to get a perspective of what to expect ourselves, along the way. As well as pick-up some handy tips, as it's our first (and possibly last) build.
Edit: just checked out your blog, in your signature - the Stillwater is a similar design to the Mandalay (central courtyard) - looking forward to seeing your build unfold.
Loving all the GJ builds lately, can't wait to follow
livpal - Can you share how you landscaped your courtyard area?
Reassuring to hear that your family is happy and without regret. We can't wait!
Its a work in progress at the moment. Its all grassed for the moment and thats the kids play area. Would love to put a pool in it some day. But we will most likely pave or deck a small part of it as this will be the kids entertainment area leaving the back for the adults. I have a thread i will try and copy and paste the thread. Not sure how to do it. My thread is called Build northern nsw- Landscaping pics
Have just been looking through your build - thanks for sharing. Well done, it looks fantastic. No wonder you're happy.
How do find the 2550mm ceiling - does it give a feeling of spaciousness?
Construction : Waiting for update plans and quotes. Contract shouldn't be far away.
Land: signed finance docs on Friday. To settle on 30 May.
Have you come across some ideas for the area? Pictures?
Cant wait to pave ours and we are going to put some sort of roof over the paved part. Will post pics when we have finished.
Cant wait to see your update plans.
Our block is big, we hope the kids look past the pool to use it. The long driveway will be handy for them too.
With our block's aspect we thought the courtayd will be a nice place to relax as well as be a bit of a feature when looking/walking through the house.
Hopefully it all comes to plan but a long way to go yet.
Related
11/12/2023
3
May I ask why you chose not to use GJ Gardiner? I'm actually meeting with one of the sales guys tomorrow for an appointment. Definitely not signing anything yet…
5/09/2023
0
Hi all. Anyone know when the $11,000 limit was set in legislation for renovations in QLD? Ive been renovating for 5 years now and this was the limit back then. As we know,…
15/02/2024
0
Hi, I contracted a Builder to do a Garage to Bedroom + ensuite conversion (Class 1a), the Builder engaged the Certifier and Engineer and received BDA from the Certifier…