I would like to ask if you guys have any idea what type of soil are there in stage 9 at willowdale. Tender will only include M type, if it turns out to be H, how much roughly is the additional cost.
I would like to ask if you guys have any idea what type of soil are there in stage 9 at willowdale. Tender will only include M type, if it turns out to be H, how much roughly is the additional cost.
Thanks in advance.
You can opt to have the tender letter include the upgrade of a slab to a certain class of soil. We increased ours for a H1 slab.
The fastest thing a builder will do is bank your cheque, those systems work perfectly with lightning speed, everything else is slow burn.
Just the way it is.