Hi,
I am building with Elderton home in Jordan Spring.
Recently my Builder send me a Variation of 21k with details below:
====================
V2.06 Provide Fixed Site Costs including the following:
- Import 68 tonne of fill for benching of site/building platform.
- Additional 30 lineal meters of concrete piering to slab area.(excluding zone of influence piering)
- Export of spoil from piering and external drainage.
- Based on uncontaminated fill only.
Charged $8000
Provide the following Drop Edge Beams to suit site conditions:
- Provide a 6 course 515 mm Drop Edge Beam to left hand side of Garage Bed 3 and Bathroom
- Provide a 6 course 515 mm Drop Edge Beam to the Porch
- Provide a 4 course 345 mm Drop Edge Beam to the front and right hand side of Lounge continue to the right hand side of Laundry and Office - Provide a 515mm intergrated retaining wall to front of Garage.
- Provide 3x precast concrete steps to the Porch
- Provide a timber step to the Laundry sliding door
- Provide a timber step to the Office sliding door
Cost $13000
Even though land is leveled with elevation between .5-1 mtr ?
Not sure if the above is really necessary , can some one advise me with that if it could be reduced or avoided.
Thanks in advance for your comments.