Hi all,
I'm building a new house with Metricon and we are planning on doing the main flooring (tiling) after handover. If you followed the same approached, I am keen to hear if you have any tips or lessons learnt we should watch out for?
Things to consider are:
1. For tiling, is screeding recommended or required?
2. If so, what clearance do we need for the doors above the concrete slab?
3. The builder is installing a glass panel in the house from the ceiling to the floor. I presume this would have to be installed after the tiles are done?
Any tips would be appreciated! Thanks.