Browse Forums Building A New House Re: Highbury Homes, Perth SoR build, Tiling Complete 281May 21, 2016 5:40 pm Re: Highbury Homes, Perth SoR build, Tiling Complete 282May 21, 2016 6:42 pm Sh*t !!! you just shake your head at times; that's so bad. Re: Highbury Homes, Perth SoR build, Tiling Complete 284May 21, 2016 10:48 pm Yeah, manufacturing was bad, didn't become apparent until the door was closed a couple of times, just normally. Re: Highbury Homes, Perth SoR build, Tiling Complete 285May 25, 2016 11:09 pm Well good news, they are fixing the sink, but have to change out half the kitchen benchtop to do this. Great that it was sorted out so quickly and the kitchen company have already been around and measured and are hoping to have it installed by next Friday. Re: Highbury Homes, Perth SoR build, Tiling Complete 287May 27, 2016 8:03 am Re: Highbury Homes, Perth SoR build, Tiling Complete 289May 27, 2016 11:06 am Decka those curtains are beautiful can I ask where you got them from I just love the colour they are stunning Re: Highbury Homes, Perth SoR build, Tiling Complete 290May 27, 2016 2:05 pm Admiring those curtains too, such a lovely colour Re: Highbury Homes, Perth SoR build, Tiling Complete 291May 27, 2016 10:04 pm spuddles76 Looks stunning Thanks Spuddles, I'd claim it but that was all the wife. Petad Decka those curtains are beautiful can I ask where you got them from I just love the colour they are stunning Thanks Petad, they are from Mandurah Curtain Gallery, nice staff there and the installer was great as well. I stuffed up and forgot to give two weeks notice for install and they were nice enough to squeeze us in. Marshall5858 Admiring those curtains too, such a lovely colour Thanks Marshall, we are very happy with them as well Re: Highbury Homes, Perth SoR build, Tiling Complete 292May 27, 2016 10:12 pm Currently having some dramas withbthe garage door. It leaks through the panels and then the frame fills up and slowly overflows. Then wheyou open the door it all pours down on the car and you if you are standing underneath the door. The manufacturer says this isn't a manufacturing fault and the door isn't waterproof that is why there are drain holes in the frame. I advised its leaking where there aren't any drain holes hence its overflowing, but they are still saying its not a manufacturing problem and all garage doors leak... The conversation go around and around. Anyways I've talked to the building commission and unfortunately it currently doesn't look like I have a choice but to go there as the manufacturer doesn't see a problem. Again unfortunate as we really love the door. Pocs in next post Re: Highbury Homes, Perth SoR build, Tiling Complete 293May 27, 2016 10:14 pm This is back in April when it was drizzling, not the weather we just had. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The frame has a channel in it that fills up with water, that channel then empties when you open the door. The water run doesn't look like much in the picture but its constant. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Highbury Homes, Perth SoR build, Tiling Complete 294May 27, 2016 10:40 pm My first thought would be they installed it upside down. Re: Highbury Homes, Perth SoR build, Tiling Complete 295May 28, 2016 10:15 am Yeah not to sure, it will be interesting to see what happens in the end. Re: Highbury Homes, Perth SoR build, Tiling Complete 296May 28, 2016 10:27 am Re: Highbury Homes, Perth SoR build, Tiling Complete 297May 28, 2016 10:41 am Bugger about the garage door Nice lounge we have never had a dishwasher till we moved into this rental, the first time I used it I couldn't wait to open the door I was like a little kid on Xmas morning Re: Highbury Homes, Perth SoR build, Tiling Complete 299May 28, 2016 1:43 pm Hooray for dishwasher! Which one have you got there? Does it have the buttons on the inside lip? Our Custom Dale Alcock build in the Village at Wellard https://forum.homeone.com.au/viewtopic.php?f=31&t=78620 Re: Highbury Homes, Perth SoR build, Tiling Complete 300May 28, 2016 2:05 pm Ooo very nice couch and dishwasher! Looking to tile the facade pillars rather than rendering. Builder is quoting 2500$ laying cost for upto 10msq. The 2 pillars come to be 16msq. So laying costs are 5000$… 0 7548 Hi, I'm clearing the tiles from our horrid 50 year old bathroom and preparing to lay new ones. Bugger of a job getting the old… 0 8088 4 14463 |