Browse Forums Building A New House Re: Building with Allworth Homes in NSW 22May 31, 2016 3:54 pm ALL worth customer service team have send us the final construction documents set to sign yesterday. Customer service team really helped us around with the documents and other issues. Great work from the customer service team. So according to the latest paper work, 20 days count down have began since 26th … Yay !!!!!!! Now need to catch-up other builds at the site..... Getting excited Again !!!! Re: Building with Allworth Homes in NSW 23Jun 15, 2016 10:39 pm Hi to people reading this... Contacted the head office to check the start date, since our '20th day' is due next week friday, they told us we will be contacted next week. So no hope to start early. Still depressing to see how fast other builders are finishing the houses.. Not sure how they catch-up the lost time... Anyway... hope to see something on the ground next week.. hmmm..... Re: Building with Allworth Homes in NSW 24Jun 23, 2016 8:48 am 20th Day have lapsed... Called Allworth homes this week, they said I should get a letter stating the supervisor details. But not letter yet. I'm not sure what is going on, but will be calling them today after checking the letter box today afternoon ...... Re: Building with Allworth Homes in NSW 25Jun 23, 2016 9:15 am wonderwht 20th Day have lapsed... Called Allworth homes this week, they said I should get a letter stating the supervisor details. But not letter yet. I'm not sure what is going on, but will be calling them today after checking the letter box today afternoon ...... You must be so frustrated Hopefully they sort themselves out asap Re: Building with Allworth Homes in NSW 31Jul 08, 2016 2:02 pm WEEK 2: Work for Piers Completed 07/07. We had issues with doing the piers; they couldn't find the bedrock. They decided not to go with piers and just do a floating slab. Plummer is hoping to complete his work on Monday. Hopefully, we'll have some better weather next week. Also I hope they will reduce the bill because no piers . WEEK 1: Excavation completed. The temporary fence around the block is in place, temp Toilet in... Re: Building with Allworth Homes in NSW 33Jul 15, 2016 11:36 am WEEK 3: Slab completed on 13/07... Waiting for the Invoice now . WEEK 2: Work for Piers Completed 07/07. We had issues with doing the piers; they couldn't find the bedrock. They decided not to go with piers and just do a floating slab. Plummer is hoping to complete his work on Monday. Hopefully, we'll have some better weather next week. Also I hope they will reduce the bill because no piers . WEEK 1: Excavation completed. The temporary fence around the block is in place, temp Toilet in... Re: Building with Allworth Homes in NSW 35Jul 20, 2016 11:04 pm WEEK 4: I went today and I was surprised see that the Frame work is almost completed. Little bit of work left on the roof. Window frames have arrived at the site as well. .. now we started to feel the dream becoming a reality . come on Allworth Homes... lets keep working at this rate .
WEEK 3: Slab completed on 13/07. WEEK 2: Work for Piers Completed 07/07. WEEK 1: Excavation completed. The temporary fence around the block is in place, temp Toilet in... Re: Building with Allworth Homes in NSW 38Jul 22, 2016 8:06 pm WEEK 4: Frame completed 21/07. Windows installed. Next roof WEEK 3: Slab completed on 13/07. WEEK 2: Work for Piers Completed 07/07. WEEK 1: Excavation completed. The temporary fence around the block is in place, temp Toilet in.. Re: Building with Allworth Homes in NSW 40Jul 29, 2016 1:33 pm WEEK 5: Gutters installed. Fitting of roof tiles started today 29/07. Expected to finish by Monday. But gutters on side of the house have fallen down. That might cause a bit of a delay. Because now need to orgnise new gutters again before they can fit the roof tiles. I'm wondering if they can start bricks on the side they completed roof tiles WEEK 4: Frame completed 21/07. Windows installed. WEEK 3: Slab completed on 13/07. WEEK 2: Work for Piers Completed 07/07. WEEK 1: Excavation completed. The temporary fence around the block is in place, temp Toilet in. Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13140 In NSW the maximum deposit for building work is 5% until the builder provides HBCF insurance 1 4814 Hi All, see above image. The required setback from the rear boundary in my case is 5m, as you can see the shape of the site and location of the boundary is slightly… 0 8432 |