Hi, we are doing a kdr and are doing the fun things prior to the demo.
One of the things that we are looking at doing now is the underground power pit.
We are looking at doing this prior to tenants leaving (so as to avoid losing time) but wonder if we have to pay to have the existing house linked to the new pit or if it is already included.
Thanks
Patrick