Browse Forums Building A New House 1 Jul 27, 2015 3:24 pm Just after verification I have got my levels on plans sussed out correctly. My plans give me RL of 100.00m. datum top of electricity pit on footpath at the lowest corner of my block, Top of main waffle pod slab is at FFL 101.2 (1200mm above RL?) and Porch and Alfresco tops at FFL 101.065(135mm below the main slab FFL?) Re: House construction levels. 2Jul 28, 2015 1:55 pm Looks like you got it correct. The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. Hi, have purchased a house with 2 single garage doors. The Centre pillar one side sits proud to the other. Can I change 2 doors into one. Please see picture. 0 2412 there is a few calculators you can use if you just google it 7 4662 because its not being managed properly. Also "properly" is too broad and too subjective a term to be able to pinpoint a single event as not being managed properly.… 1 2728 |