Hi , we didn't approve any provisional allowance for the slab. The only area where there was doubt was if rocks will be found at the time of excavation . We didn't want to sign with this and insisted this to be determined in advance. When we got the soil test done no rocks were found at the level of boring.
So in my opinion don't accept the variation for slab upgrade they should know in advance.