We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow.
Metricon Metro 32 KDRB Bayside Melbourne
http://forum.homeone.com.au/viewtopic.php?f=31&t=84012
Browse Forums Building A New House Re: Building with Metricon 5001Apr 02, 2017 11:08 pm Renman Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Re: Building with Metricon 5002Apr 02, 2017 11:26 pm JLH222 Renman Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Thanks JLH Re: Building with Metricon 5004Apr 03, 2017 11:33 am Renman JLH222 Renman Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Thanks JLH Ok, so the variation I have is to provide provisions for x2 60cm ovens and x1 90cm induction cooktop. It doesn't mention the amps, it just says that "they require higher grade power/circuit line due to the nature of induction" We were charged $490 for this. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Re: Building with Metricon 5005Apr 03, 2017 1:54 pm techau Renman techau Have posted this in my own build thread, but figure you guys may like it too. Ok so I finally took down the timelapse camera. Was fully expecting it to be cut short due to the batteries running flat, but amazingly.. I got it, the whole build from site cut to finish. So, very very happy. https://www.youtube.com/watch?v=LittDP9hqhM Great post. Where did you hang and hide the camera? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Was lucky enough to have a light post across the road. Oh that's how. We have a light pole outside ours for the go pro but we couldn't place it high enough so we had to remove it daily. Then someone tried to pry our camera bracket off the pole so we stopped lol Love the time lapse Re: Building with Metricon 5006Apr 04, 2017 7:37 pm JLH222 Renman JLH222 [quote="Renman"]Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Thanks JLH Ok, so the variation I have is to provide provisions for x2 60cm ovens and x1 90cm induction cooktop. It doesn't mention the amps, it just says that "they require higher grade power/circuit line due to the nature of induction" We were charged $490 for this. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012[/quote] But you got your range hood done by M? Building with Metricon 5007Apr 04, 2017 8:40 pm emmyawards JLH222 Renman [quote="JLH222"][quote="Renman"]Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Thanks JLH Ok, so the variation I have is to provide provisions for x2 60cm ovens and x1 90cm induction cooktop. It doesn't mention the amps, it just says that "they require higher grade power/circuit line due to the nature of induction" We were charged $490 for this. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012[/quote] But you got your range hood done by M? [/quote] My rangehood is with M but my 2 ovens and induction cooktop is post handover so they need to provision for it. So if anyone that did the same I would appreciate to hear from you. Needing to know what amps was put in and host much they charged. Re: Building with Metricon 5008Apr 05, 2017 7:51 pm emmyawards JLH222 Renman [quote="JLH222"][quote="Renman"]Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Thanks JLH Ok, so the variation I have is to provide provisions for x2 60cm ovens and x1 90cm induction cooktop. It doesn't mention the amps, it just says that "they require higher grade power/circuit line due to the nature of induction" We were charged $490 for this. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012[/quote] But you got your range hood done by M? [/quote] Yes, range hood is supplied and installed by M. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Re: Building with Metricon 5009Apr 05, 2017 7:52 pm Renman emmyawards JLH222 [quote="Renman"][quote="JLH222"][quote="Renman"]Anyone here installing their electric ovens or induction cooktop post handover? Did you have to provision a 20amp or a 63amp power point in your kitchen and if so you don't mind sharing the cost of it? We are installing 2 ovens and induction cooktop post handover. I'll have to check the contract, but I think it was 63amp. I'll get back to you tomorrow. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Thanks JLH Ok, so the variation I have is to provide provisions for x2 60cm ovens and x1 90cm induction cooktop. It doesn't mention the amps, it just says that "they require higher grade power/circuit line due to the nature of induction" We were charged $490 for this. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012[/quote] But you got your range hood done by M? [/quote] My rangehood is with M but my 2 ovens and induction cooktop is post handover so they need to provision for it. So if anyone that did the same I would appreciate to hear from you. Needing to know what amps was put in and host much they charged. [/quote] M charged us $490 but unsure of amps. I can't find it listed in our paperwork. Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Re: Building with Metricon 5010Apr 06, 2017 8:56 am pj87 Hi all I'm looking for recommendations for fencing contractors in the Southern Suburbs of Melbourne, Officer, Berwick etc... My friend's husband does fencing, he's in Berwick. Did a great job on my fences. Happy to send you a link if you want one. Re: Building with Metricon 5011Apr 06, 2017 2:16 pm blackcat20 pj87 Hi all I'm looking for recommendations for fencing contractors in the Southern Suburbs of Melbourne, Officer, Berwick etc... My friend's husband does fencing, he's in Berwick. Did a great job on my fences. Happy to send you a link if you want one. Would he travel to Bayside area too? I'll take his details too if he does Bayside (Beaumaris). Metricon Metro 32 KDRB Bayside Melbourne http://forum.homeone.com.au/viewtopic.php?f=31&t=84012 Building with Metricon 5012Apr 06, 2017 7:19 pm What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. Build thread: viewtopic.php?f=31&t=85381#p1630392 Re: Building with Metricon 5013Apr 06, 2017 10:21 pm Vantage_35 What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. What mistakes are they making? What should we be looking out for? We are expecting our final plans post variations in a week. Re: Building with Metricon 5014Apr 07, 2017 5:55 am Renman Vantage_35 What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. What mistakes are they making? What should we be looking out for? We are expecting our final plans post variations in a week. Our final plans came to us without any outside taps marked. We only caught it when we were having out initial meeting with the site manager. HTTPS://buildingourmetriconfelix18.wordpress.com Re: Building with Metricon 5015Apr 07, 2017 7:48 am Shez84 Renman Vantage_35 What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. What mistakes are they making? What should we be looking out for? We are expecting our final plans post variations in a week. Our final plans came to us without any outside taps marked. We only caught it when we were having out initial meeting with the site manager. HTTPS://buildingourmetriconfelix18.wordpress.com Yeah, it's the details - eg count the number and check position of floor wastes, make sure the right windows are glazed (if any), any rebating is indicated properly, exteriors match what was selected and matches your contract items... Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 Build thread: Metricon Liberty 45 in Ryde, NSW Re: Building with Metricon 5016Apr 07, 2017 8:55 am Shez84 Renman Vantage_35 What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. What mistakes are they making? What should we be looking out for? We are expecting our final plans post variations in a week. Our final plans came to us without any outside taps marked. We only caught it when we were having out initial meeting with the site manager. HTTPS://buildingourmetriconfelix18.wordpress.com We have made a few changes on our variations, each time we get an update we cross reference out list to make sure it's included and correct. Re: Building with Metricon 5017Apr 07, 2017 8:56 am Quirmeball1280 Shez84 Renman [quote="Vantage_35"]What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. What mistakes are they making? What should we be looking out for? We are expecting our final plans post variations in a week. Our final plans came to us without any outside taps marked. We only caught it when we were having out initial meeting with the site manager. HTTPS://buildingourmetriconfelix18.wordpress.com Yeah, it's the details - eg count the number and check position of floor wastes, make sure the right windows are glazed (if any), any rebating is indicated properly, exteriors match what was selected and matches your contract items... Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846[/quote] Do you make sure the downlights are align and centered evenly or does the electrician do a good job when they come to install it? Re: Building with Metricon 5018Apr 07, 2017 10:46 am Renman Do you make sure the downlights are align and centered evenly or does the electrician do a good job when they come to install it? Electrician took care of it at my house. Re: Building with Metricon 5019Apr 07, 2017 10:57 am Renman Nowadays, decent electricians use lasers to get it correct.... they mark the light points on the floor and point a laser from that point to the ceiling and cut holes.... so in theory it should be perfect... but of course you should check and make sure they are aligned.... and don't let the different natural light conditions confuse you... Re: Building with Metricon 5020Apr 07, 2017 1:55 pm Renman Vantage_35 What's with the Metricon's drafting department!? So many error with the revised plans....things youd think are just common sense...so frustrating. What mistakes are they making? What should we be looking out for? We are expecting our final plans post variations in a week. Just changes we have asked for that haven't been corrected or included. If you haven't made many changes it should be alright. Build thread: viewtopic.php?f=31&t=85381#p1630392 Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are… 0 10715 Hello All 🙂 We are planning to start our journey of construction our first home. We zeroed down on Metricon and henley homes based on design suitable for our lot and… 0 8157 We don’t live in VIC so want to know the exterior colours of Lumiere display so we can see it at the paint shop. Not building with Metricon so my request went… 0 17321 |