Hi all
Just after a bit of advice in relation to wet area bathroom waterproofing.
I have a striker on meter box telling me water proof ring has been signed off. It looks like the photo. I rope red waterproofing to be all the way up each shower wall to 2m to match tile height. I also expects it would be behind the tiles above the bath.
Do you think it's actually unfinished? Or is this how things are done?
Thanks
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅