Browse Forums Building A New House Re: Switch Homes. WE HAVE A DATE !! 352May 28, 2016 1:03 pm Our Home Group build: viewtopic.php?f=31&t=83475 Re: Switch Homes. WE HAVE A DATE !! 353May 28, 2016 4:13 pm Petad JKro Great news! I hope our house is built within 12 months!!!!! It really is all that prework that kills you. Thanks it should be there are plenty of trades around ATM. we had 10 months waiting for the slab to be poured so it's good that they got their act together............... sort of Today they were still trying to get the stacker doors right, that all comes down to the pad not being recessed when it was poured and the SS not being on the ball . The induction hotplate was installed today finally, the splashback is still only half done, range hood to be installed then its just all the fixes. We have booked an inspector to come through the PCI with us. My hubby wants to get an inspector in. Let me know how you go with yours. We are looking for a good referral Ours took 8 months to get to slab from when we decided on Switch but a lot of that was all the builders in our street trying to figure out what the enviro wanted. So once that was sorted and xmas was over it wasnt too bad. Cant wait to get in though! Re: Switch Homes. WE HAVE A DATE !! 354May 28, 2016 11:10 pm Petad After 20months since signing and 12 months since the slab was poured we finally have a PCI date PCI 31st May We have to be out of our rental on the 10th so come hell or high water we will be in our home that is non-negotiable There isn't much left to do just little fixes and the electrical final. Now to organize the painting .................... oh that's right that's me Driveway and paving ..................... thank goodness that's NOT me we have a contractor. Now to get excited Fantastic news. Couple of days Re: Switch Homes. WE HAVE A DATE !! 355May 30, 2016 10:47 am jesss_g Your splash back is to die for! Cheers I love it even the old boy reckons it's pretty good, we were going to have mirror but I couldn't stand looking at myself everyday 6 meters of it Perth_Euro Fantastic news. Couple of days I know how exciting tomorrows the day. How is your place?? Re: Switch Homes. WE HAVE A DATE !! 356May 30, 2016 11:10 am JKro Petad JKro Great news! I hope our house is built within 12 months!!!!! It really is all that prework that kills you. Thanks it should be there are plenty of trades around ATM. we had 10 months waiting for the slab to be poured so it's good that they got their act together............... sort of Today they were still trying to get the stacker doors right, that all comes down to the pad not being recessed when it was poured and the SS not being on the ball . The induction hotplate was installed today finally, the splashback is still only half done, range hood to be installed then its just all the fixes. We have booked an inspector to come through the PCI with us. My hubby wants to get an inspector in. Let me know how you go with yours. We are looking for a good referral Ours took 8 months to get to slab from when we decided on Switch but a lot of that was all the builders in our street trying to figure out what the enviro wanted. So once that was sorted and xmas was over it wasnt too bad. Cant wait to get in though! We had the same inspector for our roof and brick work he picked up a few things that weren't to code hopefully this inspection is going to be a waste of money (not much wrong) fingers crossed. Re: Switch Homes. WE HAVE A DATE !! 359May 30, 2016 4:11 pm Thanks guys I have just come from the house and boy have they got a lot of work to do before lunch time tomorrow Heaps of touch up painting front door not painted, floors need scraping, guest bathroom, laundry and loo need silicon so not happy with the window cleaning there are marks everywhere, no hot water, bricks need cleaning and the list goes on. It should be very interesting tomorrow any advise will be greatly appreciated Re: Switch Homes. WE HAVE A DATE !! 360May 30, 2016 8:39 pm All the very best of luck tomorrow Petad- I really hope all goes smoothly for you! Search "Pci" on the topics on here - there are some great checklists! You're almost there Any electricians here please help. 1) Will the Fan need separate switch to ON/OFF/Speed eventhough it comes with Remote 2) how about… 0 1211 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74702 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105558 |