Plantation Bronte, Ormeau Ridge QLD - Post-Handover
Page 75 of 76
So the specialist plumber came today, ground out the blockage and sucked it up. Our ensuite problem has FINALLY been fixed, without having to dig up the pipe to do it. Hooray! The only thing we have left now is some silicon where the tiles were replaced for our water stops to our wet areas. Hooray!
Oh nice! What a relief. Still think that other plumber should get fired.
Have you done two coats? I haven't done the second yet and I can't say I'm excited to do it
We have been really slack Tribe, because we've had a few very busy weekends. Uni has started again for me and I have a really heavy workload with weekly assignments so Dave is going to be in charge of painting. Hopefully this rain lets up so he can get some done on Sunday. We love it for the grass but otherwise it would be nice if it eased off for the weekend!
Sent from Tapatalk
Hows everything going? Hope your having a win with Uni as well
So we had our meeting. Still no PCI date he said "about a month, give or take" and we will only get 2 weeks notice, grr. We found a couple of issues - a power point in the wrong spot (which we'd told the previous SS!), but more importantly, the tiling on the bath in the main bathroom was not done how we pictured. This is what it looks like:
We were expecting the dark tile to be over the whole hob (sides and top). He is happy to get it fixed, but he pointed out that if we do out the dark tiles on both sides, it will look funny in the shower, and if we only put them on the front, it will look funny with the 2 sides different and also maybe too dark with the dark cabinets. What do you guys think?
More photos!
Lounge:
Main ensuite:
Library:
Paint colour:
Kitchen bench:
Will try to get some better ones on Tuesday when I'm there with the sparky.
Sent from Tapatalk
We were expecting the dark tile to be over the whole hob (sides and top). He is happy to get it fixed, but he pointed out that if we do out the dark tiles on both sides, it will look funny in the shower, and if we only put them on the front, it will look funny with the 2 sides different and also maybe too dark with the dark cabinets. What do you guys think?
More photos!
Lounge:
Main ensuite:
Library:
Paint colour:
Kitchen bench:
Will try to get some better ones on Tuesday when I'm there with the sparky.
Sent from Tapatalk
Oooh! love this paint colour!! do you mind sharing? I am also starting to build in Ormeau Ridge
My paint colour is Ghosting Half. It's a lovely clear grey without being too cool or too brown. Everyone who sees it loves it. I think it's a very modern colour.
Good luck with your build!
For anyone else who hasn't given up on me, I'm still kicking! I'll have some Christmas photos soon and maybe if you're very lucky some library photos
Sent from Tapatalk
Related
5/09/2023
0
Hi all. Anyone know when the $11,000 limit was set in legislation for renovations in QLD? Ive been renovating for 5 years now and this was the limit back then. As we know,…
15/02/2024
0
Hi, I contracted a Builder to do a Garage to Bedroom + ensuite conversion (Class 1a), the Builder engaged the Certifier and Engineer and received BDA from the Certifier…
5/03/2024
3
We used a smaller qld builder who went bankrupt about 12 months after completion of ours. It was a shame as they were good and relatively cheap and I would have used…