Browse Forums Building A New House Re: Our BTH Build in Doubleview 143Nov 20, 2015 9:04 pm Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=70984 Re: Our BTH Build in Doubleview 144Nov 24, 2015 9:33 am One day left until PCI. Yesterday we saw door handles put on and weather seals on 2 outside doors, we were expecting a little more action as the list is still massive. Plumbers have not set foot on the block yet and we still have a load of fixes that have not even been looked at. Not sure who is leading this charge but they may have left it a few weeks too late. Front façade that the renderers would not touch. - Perhaps the less than adequate brickwork is the reason why? I am no brickie but I reckon I could have cut two bricks to make this wall square instead of the lazy one brick is nearly close enough. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Our BTH Build in Doubleview 145Nov 24, 2015 9:41 am Yes they should have used Half Bond... LOL, Perhaps lucky they don't use Brickwork on the Upper Storey, where the bending-> Deflections would be greater Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Our BTH Build in Doubleview 146Nov 24, 2015 11:47 am Oh no! Sounds like you're going to have the same experience as us ![]() Yes can see why they haven't rendered... Good luck Dongster! Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=70984 Re: Our BTH Build in Doubleview 147Nov 24, 2015 12:26 pm We aren't having flyscreens installed so saving 2 weeks there alone. Electrical not finished, painting not finished, kitchen not finished, tiling not finished, plumbers nowhere to be seen, stairs not done, balustrades not done, A/C not done, cornices not finished, render not done, repairs not started. Waiting on CLO to advise. Our trades start in 2.5 werks time. Signed up April fools day 2014. Its still funny. Re: Our BTH Build in Doubleview 148Nov 24, 2015 12:57 pm Oh man Dongster, that pillars are shocking. Hope they come up with a fix for it. You sound worse off than me. I'm hopeful most things will be done by Friday. I have to laugh when they said they are doing it earlier than usual so as not to hold us up anymore? I mean it's only take 54 weeks and you're still not finished. How is that not holding us up? the jokes are wearing thin. Good luck for tomorrow. Re: Our BTH Build in Doubleview 149Nov 24, 2015 1:13 pm Thanks archetto and DandyDons. I dont think luck is what we need but I'll take anything that is offered. Re: Our BTH Build in Doubleview 150Nov 24, 2015 10:08 pm Well I went to the house today expecting to have seen at least a fair bit done on our outstanding list prior to PCI tomorrow. All we had was an initial clean done. So the inside of the house is cleaner but what a disappointment. Powder room - to be done, add one toilet and clean what should be a brand new pipe. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Our BTH Build in Doubleview 151Nov 24, 2015 10:29 pm We were the same today Dongster. Cleaners were in but said they couldn't do much as there's still to much to be done. All they could do was wipe the sone down and cleaned the Windows which are sparkling lol. I was expecting to see a few trades there today but no. I can totally relate with you. Hope they have answers for you tomorrow. Re: Our BTH Build in Doubleview 152Nov 24, 2015 11:05 pm Geeze guys, sorry the same disappointing PCI is about to be inflicted on others ![]() Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=70984 Re: Our BTH Build in Doubleview 153Nov 25, 2015 11:44 am Hope the meeting went alright Dongster Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=70984 Re: Our BTH Build in Doubleview 154Nov 25, 2015 6:29 pm Folks check your toilets to see there isn't too much gap and the cistern doesn't wobble. If u got BT to install r/c aircon, run for a while and see if condensation drains away correctly or if there is leaking happening into the house from an overflowing drain tray. Make sure your downpipes have been capped off to the eaves on both floors. Check that tops of doors are painted....do they think that isn't part of the door? More to the topic.....it ain't PCI if isn't practically complete! Our build thread [url]https://forum.homeone.com.au/viewtopic.php?t=71492/url] Prestart: 18/7/14 Final plans: 13/8/14 Building permit: 30/9/14 Re: Our BTH Build in Doubleview 155Nov 25, 2015 6:44 pm Hi Ronfire +1....I thoroughly recommend that all flashing is checked as the upper floor stud walls are without drainage cavities..thanks for pointing that out Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Our BTH Build in Doubleview 156Nov 25, 2015 6:46 pm How are you meant to check the flashings? Ie. Explain what we are meant to look for? Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=70984 Re: Our BTH Build in Doubleview 157Nov 25, 2015 6:53 pm Did you take photos and do you have the construction details to check? Well its not suppose to leak.. OT I guess they said that about the titanic ![]() (Sorry , I see the funny side, if there is one?) Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Our BTH Build in Doubleview 158Nov 25, 2015 6:59 pm They replaced all our flashings despite the leak being at the back of our house (box gutter) so until next winter we won't know if they fixed the problem or created one Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=70984 Re: Our BTH Build in Doubleview 159Nov 25, 2015 7:06 pm ![]() They replaced all our flashings despite the leak being at the back of our house (box gutter) so until next winter we won't know if they fixed the problem or created one I hope they got the fix right..long term corrosion may be a bigger issue if you are coastal/marine. I suggest you get copies of warranties as well. HTH Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Our BTH Build in Doubleview 160Nov 25, 2015 8:05 pm Thanks Ronfire. Will check toilets once installed. Our SS checked tops of doors for us. Lots and lots to do but promised for 2 WEEKS. I am hoping this is a better 2 weeks than the last. I second taking your plans elsewhere. They're yours (unless you ended up in one of those cheaper arrangements where you don't own the rights and the build will be tendered… 2 33134 Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 70402 We are building a second dwelling and are currently selecting window and door frames. We want to blend into the forest and also bring out the stone work and the fake wood… 0 28057 |