Hi, I just received a tender, was charder about 33K for BASIX and non site specific cost. I have a 2M slope, so the site specific cost was 57K. Are these reasonable?
Foot print is 20 X 15
Browse Forums Building A New House 1 Jan 20, 2015 12:36 pm Hi, I just received a tender, was charder about 33K for BASIX and non site specific cost. I have a 2M slope, so the site specific cost was 57K. Are these reasonable? Foot print is 20 X 15 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Is anyone building with Mojo and have a recent site cost tender 0 15993 Henley should give you some indication of site costs. Too many variable to give you any reasonable accuracy 1 1901 Looking to tile the facade pillars rather than rendering. Builder is quoting 2500$ laying cost for upto 10msq. The 2 pillars come to be 16msq. So laying costs are 5000$… 0 7663 |