H3nl3y KDR Mont3r3y belle q2 - post handover work
Page 13 of 28
Hope these things get fixed. I know they are only little but they are right at the front
Looks like we are going to get an independent inspection report now. Too many things are looking rough. Now to figure out how to organize it.
Jessicana10 I think that's a very good idea, we used BE from this site. Very helpful and informative. Good luck with getting all your issues fixed.
SS said they took the tiles off the wall as they are thicker than the cornice. Not sure what they are going to do to fix this.
Also our facade is wrong.
We can leave the full length pillars or they can take the top few rows off but then they have to move the 3 JB in the pillars.
Anyway, no work going on today or tomorrow so I'll worry about that later in the week.
In the mean time I've found a program where you can enter in all your walls and windows etc then play around with furniture and colours - I'm addicted here is a few examples
Green and white
Brown and white
Corner couch
The quality is much better I just took photos of the computer screen.
It must be disheartening I know but there will be a good reason for the plaster mods.. better to get them fixed now than once its painted.
Also dont worry about the down pipes.. a different person does the storm water connection and it will have an elbow in it thats buried and will connect up perfectly.. mine looked like that too. Get good photos so you know where they are now and youll be able to run drains if you concrete down the side of your house
The tilers came and grouted the floor and remaining wall tiles. Still more tiles need to go up. In pleased to say our grey tiles look much better than our white ones.
There is still a lot of work to do with them. A lot of the grout is messy and will need re doing and more tiles need to be laid but at least we got a little bit of work done today.
Shower base is looking better
Kids shower
Ensuite bathhob
Laundry
Laundry splash back. They need to do more tiles on the sides so it's same height as the rear wall and I'm annoyed they put the cut tiles on the top and not the bottom -
And timber cladding between the living room windows has been done
And what's the go with this? Some of the cupboards have huge hinges and some little ones????
Btw, your tiles in the shower look very familiar. 😄
Anyway: on Monday they came and did some plaster fixing and started the timber staining.
Yesterday didn't really do anything but take all the doors off and I'm not sure what they are doing today. Maybe the eaves.
It's is in slow motion now. Hardly any work in the last 3 weeks
The windows are being stained - that's also looking great
Our ensuite however makes me cringe. It's being butchered even more
And who ever is tiling it can't tile straight to save themselves
Related
28/09/2023
8
We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before…
21/09/2023
2
The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.…
21/09/2023
0
Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them.