Browse Forums Building A New House Re: Mojo Homes 940Apr 28, 2017 7:52 am Crownleyian ja-mez 2 months is normal for that process. As for cdc take out the council portion and its only 3 weeks of the 9 it took. Add the cdc time youre still at 7 or 8 weeks..... So much for moving in before Christmas Do you think? What was the construction period for you? Plus weather impacts not counted in the calculation Is anyone building with Mojo and have a recent site cost tender 0 15954 Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13167 Hi, We are looking for a builder that can build a small home (smaller length) on a sloping site. We came across Mojo's Zephyr design 10.6 m wide and 11.5 m length. Does… 0 23029 |