Browse Forums Building A New House 1 Dec 03, 2014 1:04 pm I've just done a costing up for the fees associated with building on a block I'm currently considering. It's on all town services and honestly I'm a little shocked at the fee's required because of these services. These are just new connection fees required by the council and do not include the actual connection itself in terms of getting a plumber to install a water meter, hook up sewer etc. Water & Sewer $9,500 Installation of water meter, tap and pipes/materials to make the connection not included. Dev App plus required certificates/permits/inspections up to and including OC $2,400.00 Is this fairly typically of associated building costs or have I picked a really expensive shire? Even if it's not being sub-divided and you want to keep it as Torrens title, you will still need to talk to a town planner or Council themselves, to see if they will allow… 1 11035 We've had the offer of a short term tenant whilst waiting for CDC/DA home approval and demolition for our knock down rebuild. It would achieve a pretty low rent as it's… 0 13752 This was on google. Development controls 2.3.1 Front setback D1 New buildings within residential areas shall adhere to a front building line, which is 5.5-6m to the… 1 3664 |