Building in Adelaide wth Oakford - PCI
Page 5 of 5
The curtains are rather temporary while we get them sorted out. We're aiming at 2500 drop curtains, and there's not that many pre-made ones around in pinch-pleat. We bought a few sets from Curtain Wonderland to check out the colour, but now the colour we chose has disappeared, so I'm not sure if we can get more the same. I've been planning out how to build in pelmets for them, so have quite a job ahead of me with them. That's on top of fitting out the robes and doing the perimeter paving .. and getting the old house ready for sale! I probably need a bit more discipline, as I've been putting more time in the interesting jobs rather than so much the important jobs
Here's how the front's looking:
I'm pretty happy that it's been a fairly good match from the 3D renders that I did.
Congratulations on a beautiful looking home and getting in ok
Using my LG-G4 to bring you this update.
We all still have a long way to go until the outside looks semi decent.
I signed early last year and have regretted it ever since (and they are still going, they only turn up to the site maybe once or twice a week)!
My advice - take a level and check their brickwork constantly.
After the build start though, things seemed to move at a decent progress for us. There might be times when trades would only show up on site once or twice a week, but that's not unusual in scheduling a build. They may be running short of trades at the moment though, or your site supervisor may not has much sense of urgency. Hope it picks up for you as the build goes on.
Related
18/08/2023
6
We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports with photos at every stage,…
7/11/2023
1
i would not be signing anything on the day read your contract about when builder submits final invoice generally, have to meet builder within 7 days of receiving final…
24/12/2023
0
Building a new home, and looking for a garage builder (home builder not contracted to do this). Someone to build steel garage (double), colorbond, including supply and…