Browse Forums Building A New House Re: KDR with Sekisui house 745Aug 25, 2016 9:00 pm Building a sekisui house in Holmesville NSW viewtopic.php?f=31&t=75060 Re: KDR with Sekisui house 750Aug 30, 2016 12:52 pm Building a sekisui house in Holmesville NSW viewtopic.php?f=31&t=75060 Re: KDR with Sekisui house 755Aug 31, 2016 6:12 am mim_feher It is looking amazing you must be so happy. Are they 40mm bench tops, I wish our budget could have allowed them. sekisui build viewtopic.php?f=31&t=75060&p=1573965#p1573965 Thanks. They are 40 mm. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 756Aug 31, 2016 6:14 am EPaul888 Wow vivmak...nice photos! Is PCI now done? Hopefully no major issues so you have keys asap! Yay! Yes. PCI done. Some minor and atleast ine medium size issue with the aircon panel being fitted on yhe stairs ratber than at a stable platform. They think it js as per plan buy it is not and is dangerous to operate standing on stairs. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 757Aug 31, 2016 6:15 am yvonneh Looks great! Love the French doors Thanks. Hopefully I can build a deck outside french door for morning cuppa 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 758Aug 31, 2016 6:16 am shazaw Every pics looks wonderful vivmak, lots of room for more parking on the left side of your home....space for future boat. I have pick same colour for kitchen's splash back. viewtopic.php?=31&t=81624 No scope for boat in budget anymore. A few veggie patches more likely. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 759Sep 06, 2016 9:05 am First floor flooring Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 760Sep 06, 2016 9:07 am Unnecessarily laege main room with WIR Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37139 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 19096 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13442 |