We are getting a 6 x 3.5 concrete pool with water feature, LED lighting, heating etc for $32,600.
That being said - take into account removal of soil from the dig, pavers, paving, fencing etc and it will be around the $45-50k mark.
If you enquire dont be fooled by the low prices quoted as there are alot of 'finishing touches' etc that are required.
We are now waiting the pool plans to be approved via CDC then we can start!
Thanks marknbet, I really am shocked about how expensive they are. Looks like this will definitely be something we do down the track rather than as part of the build.