We escaped with only H1. Still a P, due to the fill.
It really must vary a lot across that section
What does the fill relate to? Is the when the estatate was levelled and subdivided?
Browse Forums Building A New House Re: Looking for help with the External Colour Selections 21May 15, 2014 2:03 pm BLOG: http://www.ourphoenix38.blogspot.com.au H1 THREAD: viewtopic.php?f=31&t=70454 Re: Looking for help with the External Colour Selections 22May 15, 2014 2:09 pm Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Looking for help with the External Colour Selections 24May 15, 2014 7:37 pm Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Looking for help with the External Colour Selections 26May 19, 2014 7:33 pm No, on the report it only shows Class H2-D, and P for fill, they said they needed to bring more soil. insider Rainleaves A engineer will have to design your footings with that soil report and your build in mind. I think Mt. Barker is in S.A. which has some of the most reactive soils in Australia some areas are class"E" extremely reactive.Did they say why it was a class "P" ? How much are you ahead in payments compared to where the build is at? Have you fully drawn down the loan? 5 11915 Thanks Pulse, thats really helpful and very much appreciated. Also thanks for the pointer on sheathing, thats me watching too many american youtube videos! 6 2796 Hi team, Im looking for a second hand sd4b monitor preferably white. 0 8923 |