My Mcdonald Jones Blog - Drop in
Page 1 of 1
We are building with Mcdonald Jones (Milano Four), and are about to sign contracts, and wanted a place (A BLOG) to put the good, the bad and the Ugly.
Feel free to head on over to watch our Progress.
Here is the blog link http://mjh-milano-15m-bingara-gorge.blogspot.com.au/
Thanks for stopping by, And I hope you get some value out of our Journey!
Related
11/08/2023
0
Hello everyone, After some suggestions and ideas about how to put a concrete path around the drop edge beam area on our new build. We are required to have a concrete path…
22/10/2023
5
The distance between my DEBs varies from 4.1m at the narrowest to 8.1m at the widest.
30/10/2023
0
I would like to build our new house with the rear section approx 1 metre out of the ground, I don't particularly like to go bearers and joists so concrete slab all the way…