Browse Forums Building A New House Re: Building The Hudson by Simonds - The Range, Melbourne 61May 21, 2014 10:02 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Building The Hudson by Simonds - The Range, Melbourne 66May 29, 2014 9:47 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Building The Hudson by Simonds - The Range, Melbourne 71Jan 30, 2015 9:13 pm homeontherange We just got a call from our SS letting us know that our slab should go down on the weekend. Would it be too sad/stalkerish to go and watch from a respectable and OHS compliant distance??? I was interested to view your thread. Our journey begins in March as we take land title in February. Same Hudson, give or take a few upgrades/changes I believe. How long was it between concrete pour of waffle pod slab (I presume waffle) until they started the frame up? I am interested because it cost me $600 extra to have builder's concrete contractor apply chemical cure day of finishing slab and leave cure for 7 days minimum with formwork boards left in tact for curing purposes. I will need to organise high pressure spray cleaner of the slab after the 7 days to remove the curing compound from slab surface before the bottom plates are placed and frames built. I do enjoy the drama:-D In his latest two videos he has started bringing security guards to site, I am waiting for the punch on to begin lol 6 45607 custom probably not. Volume, most defiantly, but spec would vary. If youre doing a knock down, there additional costs associated with that that will eat into your budget… 1 10287 I have posted this before: We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports… 2 4561 |