Browse Forums Building A New House Re: Burbank Custom DS-Handover / We Got Keys!!! 321Sep 14, 2014 6:33 pm This is great news Menton!!! Finally all hard work has been paid off...! 27.08.13 Building Contract 09.07.14 Site Start 24.07.14 Base / Slab 28.07.14 Frame 27.08.14 Lockup 15.09.14 Fixout 25.11.14 Settlement Re: Burbank Custom DS-Handover / We Got Keys!!! 322Sep 14, 2014 11:00 pm Congratulations mentone you made it!!! now all thats left is to enjoy your beautiful new home! Re: Burbank Custom DS-Handover / We Got Keys!!! 323Oct 25, 2014 9:32 pm I come across your thread. Congrats on getting the keys! Have you moved in yet? I am looking for a wall faced toilet suite and see yours. May I know the brand and model? I assume you haven't had a chance to test it out and able to tell me if it flushes well? Timeline: viewtopic.php?f=31&t=76782 Re: Burbank Custom DS-Handover / We Got Keys!!! 324Oct 26, 2014 6:19 pm Congrats on the keys Your hot water unit is similar (if not the same as mine) - looks like a robot Custom downslope build Build thread viewtopic.php?f=31&t=61873 Blog http://www.buildingroyalmanor.blogspot.com.au Re: Burbank Custom DS-Handover / We Got Keys!!! 325Oct 31, 2014 7:18 am sofia14 I come across your thread. Congrats on getting the keys! Have you moved in yet? I am looking for a wall faced toilet suite and see yours. May I know the brand and model? I assume you haven't had a chance to test it out and able to tell me if it flushes well? Hiya Sofia14 Sorry for the late reply been busy with the move and unpacking Yes we have wall faced toilet suite [Caroma Opal Wall faced toilet suite ] I dont know if its the water setting but seem i need to flush it a couple times.. Maybe i just havent had chance to look into the water pressure etc? But i must say it will be easier to keep clean specially around and behind the toilets Are you also building? What stage are you at? Anyway I have a blog so feel free to visit if you need any details on model etc on below link http://ourmentone3850.blogspot.com.au/p/blog-page.html HomeAngels Congrats on the keys Your hot water unit is similar (if not the same as mine) - looks like a robot Hiya HomeAngels Hows the house going? Have you done much since you moved in? Cant wait to see some updated pix Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom DS-Handover / We Got Keys!!! 326Nov 08, 2014 11:29 pm Hey Mentone3850 have loved reading through your thread I feel like I'm in the same limbo as you were in August and September, gosh these builders take their times with giving out dates. Hopefully mine runs as smoothly in the end as yours did after PCI. Love your house, looks great we went with chestnut bricks great choice! Hope you've settled in well. Re: Burbank Custom DS-Handover / We Got Keys!!! 327Jan 15, 2015 4:57 pm Hello hello All I thought I check- in today to see how everyone else builds or peoples been up to since they moved into their homes As for us cant believe its been (4) months since we received the keys and (3) months since we've moved so what have we been up too you may ask Thought I share some link to some of the BLOG I have posted on the handover projects we have done Backyard concrete http://ourmentone3850.blogspot.com.au/2014/09/back-yard-concrete.html Brick Fence http://ourmentone3850.blogspot.com.au/2014/09/front-brick-fence.html Front Concrete http://ourmentone3850.blogspot.com.au/2014/10/front-yard-concrete.html Custom Shed http://ourmentone3850.blogspot.com.au/2015/01/garden-shed-complete-week-8-post.html Pergola http://ourmentone3850.blogspot.com.au/2015/01/pergola-week-11-post-handover.html Front Landscaping http://ourmentone3850.blogspot.com.au/2015/01/front-landscaping-week-16-post-handover.htmll Also for those that have missed or come in late here is a quick snap shot of how a piece of vacant land has been transformed into our home http://ourmentone3850.blogspot.com.au/p/our-mentone-3850.html Would love to hear from you Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom DS- 4 months post Handover ! 328Feb 01, 2015 8:09 am Oh my God!, you've been very busy well done, you are doing well with your post handover tasks. I'm green with envy lol. Love your front brick fence, how much was it if you don't mind me asking. You are doing very well, good job - Build thread- My Allegra- Dream by Henley This certainly doesn't look good. I would be engaging with an independent inspector to have a look at this. As for the unscheduled site visits, most builders are quite… 1 28319 Hi All, Recently we have signed a contract with Burbank and we are not aware that they have just DORSET, SURREY, HAMPSHIRE, KENT, PILBARA and REDGUM bricks from PGH are… 0 3155 It seems very clear to me that your contract states that a security account does NOT need to be established so the answer to the builder is NO. If in doubt find a contract… 1 8505 |