Browse Forums Building A New House Re: Builder offered to be paid cash in hand - risky? 4Oct 31, 2013 4:20 pm The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. Re: Builder offered to be paid cash in hand - risky? 8Oct 31, 2013 4:48 pm Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Builder offered to be paid cash in hand - risky? 10Oct 31, 2013 5:11 pm Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Builder offered to be paid cash in hand - risky? 12Oct 31, 2013 5:35 pm The savings are tempting but not something I would do for the entire build. The only time I would ever even consider it is maybe if I was an OB and just employing him week by week. http://camdenbuild.blogspot.com.au/ by invite only please pm me If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4491 Hi Mofflepop, I would recommend finding a building designer to prepare plans, they should design to your specified budget. The benefit is you can tender the project out… 9 20434 |