Hi all,
We are looking at building the Sorento with Carlsile homes in Berwick
the land we are looking at has about a 2 - 2.5M slope from the front too the back, but about the first 2m is steep at the front, so where the drive way is, and then it gets quite flat at the top with a very gentle slope.
We have been quoted about 15000 fixed site cost + council requirements + estate requirements son about 22000 in total.
Does this sound about right?