Browse Forums Building A New House Re: Redink SOR First time builders-Brickwork 662Nov 24, 2014 5:13 pm Building with 101 Residential Rear Strata in Queens Park Our Build thread - https://forum.homeone.com.au/viewtopic.php?f=31&t=72336 Re: Redink SOR First time builders-Brickwork 665Nov 26, 2014 10:13 pm Building with 101 Residential Rear Strata in Queens Park Our Build thread - https://forum.homeone.com.au/viewtopic.php?f=31&t=72336 Re: Redink SOR First time builders-Brickwork 674Nov 27, 2014 10:23 pm Building with 101 Residential Rear Strata in Queens Park Our Build thread - https://forum.homeone.com.au/viewtopic.php?f=31&t=72336 Re: Redink SOR First time builders-Brickwork 678Nov 28, 2014 9:49 pm ardie514 Well things are moving along. Bricks almost done. I stopped by today and met the brickie. He's got 2 guys with him. Apparently his nephews and they've been off and on the job. Really nice guy. Apologetic about how long it's taken but said they'd be done by tues or wed. Brought him a carton for his hard work and he gave me a hug and a kiss CLO tells me that our roof timbers are due to be delivered week of dec 8 and carpenter supposed to start that week too. Highly unlikely at this point that the roof will be on by xmas shut down but I'm still hoping. FYI Jay89 and Kash, our brickie said his next job is across the street from us We'll do a walk through this weekend and I'll get pics to share. TGIF! Happy weekend y'all My bricklayer team started either Monday or Tuesday and i think is close to 50% today. So most likely it will be Kash Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2080 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 3803 |