Browse Forums Building A New House Re: Building with Simonds in SA (LOTS OF PICS) 321Sep 09, 2014 11:51 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Building with Simonds in SA (LOTS OF PICS) 323Oct 27, 2014 9:38 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Building with Simonds in SA (LOTS OF PICS) 325Oct 27, 2014 12:31 pm Building a Sierra on the Gold Coast https://forum.homeone.com.au/viewtopic.php?f=31&t=68899 Full timeline on Pg 1 Settlement: 13/05/14 Retaining Walls: 20/06/14 Site Start: 02/07/14 Re: Building with Simonds in SA (LOTS OF PICS) 329Jan 15, 2015 2:04 am 7.5M Dual Frontage terrace @ lightsview SA /viewtopic.php?f=31&t=58754 moved in - April 2014 furnitured - August 2014 home theatre - September 2014 Game room - December 2013 moved in - 09 April 2014 Re: Building with Simonds in SA (LOTS OF PICS) 330Jan 15, 2015 9:15 am For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Building with Simonds in SA (LOTS OF PICS) 333Jul 04, 2016 5:20 pm Hi thank you! I will be jumping on there in a moment My partner and I are building the Turin (altered to have littler luxuries) and so far we're extremely pleased. I'm glad to hear that you've have a good experience too!! Thank you again My land is 260m2 (10m x 26m) located in claymore NSW. Under campbelltown council. I know in general the following setbacks would apply ground floor side setback =… 0 4229 I’m curious about how you went with this. We are planning a KDRB and considering Plantation Homes as a builder. I’m aware that after the demolition another soil test… 1 6305 i wouldn't be worried, you'll definitely miss something, no matter how many times you review. we've spent close to 5 months ensuring everything got reflected in the… 5 9432 |