http://i832.photobucket.com/albums/zz241/GillyM63/IMG_4970_zpsvlkfrkl4.jpg
Nope i paid extra for this outdoor double power point was supposed to be on the corner of my house for my outdoor christmas lights
Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 13102Jan 17, 2017 3:40 pm Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 13113Jan 18, 2017 8:07 am Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 13115Jan 18, 2017 8:51 am Sandra 2016 - I looked on my plans doesn't show nothing on mine either , KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Re: Masterton Homes - The next thread 4.0 13116Jan 18, 2017 7:29 pm Hi Carriehhan! My husband has made our letter box, done some tree planting and finished off the front of the house. We just have to sort out our front steps the stupid landscaper messed something up so hubby has to fix it so we get our final oc. Then we have the shed to put up and the finishing touches on the patio area. And that's pretty much it for us. But Masterton follow ups is a longer list: Tiles Direct have to get a hold of masterton to fix our balcony tiles and floor tiles. And there's a few chips in cabinetry they have to fix and get the carpenter out to fix one of the robes and then the stacker doors and the paint up the side of the house. So much to do haha I'll post more pics once i get around to it. How's you house going? Hi Building4my3tots thanks! We like it, he's not for everyone but we love Charlie lol he's from urban road. 120x160 plus the frame. They have a large selection I'm sure there's something to fill that amazing space and compliment your colours. https://mandgbuildatmulgoarise.wordpress.com/ Re: Masterton Homes - The next thread 4.0 13117Jan 19, 2017 3:21 pm Hope this helps. We only have one pipe coming from house. Excuse the plastic, waiting on driveway pour. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Synergy 32 Contemporary Facade https://synergy32.wordpress.com/ 05/15 Deposit 09/15 Contracts 11/15 Demolition 02/16 Slab 03/16 Frame 05/16 Bricks Re: Masterton Homes - The next thread 4.0 13118Jan 19, 2017 6:57 pm By the looks of yours Shire Synergy they have put 2 extra pipes in mine by mistake. Also do all you guys have these door stoppers in your place i would have thought white walls white stoppers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I had my door handles done today, shower screens Fri 27th and looks like PCI in the arvo of 27th. I have booked in my own building inspector to come with me on PCI walk through Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Masterton Homes - The next thread 4.0 13119Jan 19, 2017 8:13 pm Same stoppers for us Sandra. Synergy 32 Contemporary Facade https://synergy32.wordpress.com/ 05/15 Deposit 09/15 Contracts 11/15 Demolition 02/16 Slab 03/16 Frame 05/16 Bricks 4 16727 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16001 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20176 |