Browse Forums Building A New House Masterton Homes - The next thread 4.0 11823Aug 02, 2016 7:07 pm Synergy 32 Contemporary Facade https://synergy32.wordpress.com/ 05/15 Deposit 09/15 Contracts 11/15 Demolition 02/16 Slab 03/16 Frame 05/16 Bricks Re: Masterton Homes - The next thread 4.0 11829Aug 03, 2016 10:13 pm Synergy 32 Contemporary Facade https://synergy32.wordpress.com/ 05/15 Deposit 09/15 Contracts 11/15 Demolition 02/16 Slab 03/16 Frame 05/16 Bricks Re: Masterton Homes - The next thread 4.0 11840Aug 04, 2016 7:47 pm Fisher75 michelle1980 Out of interest fisher75 how long have u been at lockup? Is it a 2 story house ? We were told realistically about 12 weeks from lockup to pci We have been at lockup since 15th of July. I guess my SS gave me that very soon date just to get rid of me. Have u been tiled yet? Apparently there is a 3-4 week wait on tilers due to the amount of houses to be done 4 16558 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 15822 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20163 |