Browse Forums Building A New House Re: Building the Marriott with Simonds in Wantirna South VIC 52Feb 27, 2014 8:49 am Se2 J Elhati looks awesome when is the handover? Thanks Elhati. We have not been advised about handover dates yet. Our main aim was not to worry about any dates, or minor errors in the building. End of the day they are human-beings mistake happens and it is their job to worry and rectify. We want enjoy every moment of building house. We are excited, happy and therefore I have started looking for boxes and started little bit of packing. Hi Se2 J and Elhati. Thanks for your interesting and informative posts. We're considering the Marriott and we're wondering what was the ballpark figure that you paid the builder for your homes with the small adjustments that you made ? Re: Building the Marriott with Simonds in Wantirna South VIC 53Oct 03, 2014 1:13 pm Hey just curious. How much did it cost extra to have the sliding door instead of standard doors for your theatre room? Its a fantastic idea and am thinking of replacing the double doors i have on my plan for the theatre room and having the sliding door too, it really maximises the space for that room. Thanks Adam Baines Grad Cert Bldg Surv / Grad Dip Bldg Surv / MSAAPA Accredited Building Professional APB20210035 Builders Lic 183023 Pest Control Lic 84868 Ph 0412202336 PO… 3 47252 I have posted this before: We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports… 2 4900 Well these guys are not looking good... I sent them a written enquiry last week and they have not yet replied. If they cannot respond to a simple… 4 11023 |