Browse Forums Building A New House Re: When to negotiate on price/getting extras included 13May 09, 2013 8:01 pm ashandem yes iam fully aware of that, thanks anyway. I started the retaining walls yesterday and i have a bobcat going there on saturday to do some leveling a prepare a pad for the shed. be careful what you do, i was going to do this and the site looks completely different after they cut it all out, so perhaps hold off till you have the siteplan as part of the soil reports. they cut away where i was going to put the shed. Initial Deposit 28/09/2012 // Prelim Contract Signed 25/11/2012 Selections 21/1/2013 to 23/1/2013 // Contract Signed 22/2/2013 Site Start 21/5/2013 // Slabbed 30/5/2013 hey there! π so, itβs kinda common for standard drawer depths to be around 500mm since most cabinets use this size to fit the usual runners… 3 20890 Use a product like Equisol's Vitalise to clean the deck then coat with a penetrating timber oil. It will look 10 years younger and add value to your home. Visit for… 1 15765 How much are you ahead in payments compared to where the build is at? Have you fully drawn down the loan? 5 11893 |