Browse Forums Building A New House Re: Non-starter? 5Apr 29, 2013 2:48 pm - MrsT Brought first house in 2008. Renovated...a LOT. Built in 2013. Our thread: viewtopic.php?f=31&t=67954 Re: Non-starter? 6Apr 29, 2013 5:01 pm Laura Jane 28 It would appear so - $4211 included on the quote for "reinforced concrete slab with FFL to Engineers's detail for Soil Classification Type M (Waffle Void Farmers System)". Most builders quote Class M slab as standard but you won't know what the site costs are going to be until the site is surveyed and the geotech is done. Sloping site and worse soil classification and the cost go up. See this link to get an idea of the extra costs http://www.anewhouse.com.au/?p=6 The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. From a pure legal perspective, if you've signed the variation, it is a very high bar to have it set aside. No-one can give you legal advice on a forum, but you would need… 3 5480 Thanks. There are plenty of builders around my suburb. I'll make sure to do some door-to-door knocking, or note their building details on the temp fence. 4 4752 Building Standards; Getting It Right! Long story short, a toilet room is going to back onto our main bedroom and I want to make it close to soundproof. Im going to build two frames (pretty much a room within a… 0 10216 |