Browse Forums Building A New House 1 Apr 24, 2013 7:38 pm I recently had my poured limestone done, driveway and path to front door. There is a slope where the path connects to the driveway. It's a horrible slope, it looks flat on one half but the outer half of the path peaks up making you trip. My husband enquired about it before the pour, and they said it had to be like that. Having now walked on it and seen my daughter trip on it, I'm not happy. Is this avoidable?? I'll call him tomorrow but I'd like to be able to rebut if he tells me there's no other way to do it. GOODLIFE - Bravo - BUTLER http://getmistyfied.blogspot.com.au Display 20/02/2012 PPA 01/04/12 Prestart: 25/07/12 Settlement: 31/07/2012 Contracts:August Slab 19/11/12 BRICKS 10/11/12 Roof 16/01/13 Hello everyone, After some suggestions and ideas about how to put a concrete path around the drop edge beam area on our new build. We are required to have a concrete path… 0 12875 Thank you so much for your response. I have drawn a pedestrian gate in - for curb appeal, let's see how much costs come in at. I think you're right - if we decide to… 2 6545 Hi all Following the recent heavy rainfall in Sydney, I am keen on redirecting water away from the house's base as much as… 0 6802 |