Browse Forums Building A New House Re: Redink Trinity, acrylic render question. 302Nov 29, 2013 2:23 pm Woww yeah you have had lots going on at yours then cedes. Early Feb handover is about as good as you can get I think! Sounds like your SS is on the ball. No word for me about any dates. Had the solar hot water panels installed yesterday and my acrylic render was done on Wednesday. I'm hoping to see some solid work done before Christmas. Redink Homes in Banksia Grove Handover 13/02/14 https://forum.homeone.com.au/viewtopic.php?f=31&t=65768&p=1068366#p1068366 Re: Redink Trinity, todays work 303Dec 02, 2013 7:55 pm Garage door went on today, apparently the electrical fit out should be done this week also. Getting there slowly but surely! building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 304Dec 02, 2013 9:29 pm Nice one, even I don't have a garage door! LOL Good luck with the next 3 weeks worth of work, there won't be much for them to do after the break Our RedInk Build Thread - viewtopic.php?f=31&t=64118&p=1004131#p1004131 ** Timeline Page 1 Moved In - 19.12.13 Re: Redink Trinity, todays work 306Dec 04, 2013 7:53 pm Shower screens and mirrors went in today. The plumbers still haven't been back to finish the second shower in the ensuite or the carpenter to finish off the linen closet. Why do they only do half a job????? building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 307Dec 05, 2013 9:34 am Because they have 5 days to complete the job..... I think they like stretching the work over several days so they can drive the owners insane! Our RedInk Build Thread - viewtopic.php?f=31&t=64118&p=1004131#p1004131 ** Timeline Page 1 Moved In - 19.12.13 Re: Redink Trinity, todays work 308Dec 05, 2013 10:45 am Aww cedes I had my shower screens and mirrors put in yesterday too! Wonder if it was the same people doing it Have you been able to get inside and have a look then? Hopefully your shower will be in by the end of the week. Redink Homes in Banksia Grove Handover 13/02/14 https://forum.homeone.com.au/viewtopic.php?f=31&t=65768&p=1068366#p1068366 Re: Redink Trinity, todays work 309Dec 06, 2013 9:21 pm Wfry - yes we managed to get in yesterday, hubby got loads of photos but he's stuck doing overtime at the moment so hasn't loaded them on the computer! Our electrical fit out was done today, not great photos as they were through the window! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 310Dec 06, 2013 9:24 pm Woo Hoo!!! Our RedInk Build Thread - viewtopic.php?f=31&t=64118&p=1004131#p1004131 ** Timeline Page 1 Moved In - 19.12.13 Re: Redink Trinity, todays work 311Dec 09, 2013 5:40 pm Hey cedes, What colour is your render? It's very nice! Re: Redink Trinity, todays work 312Dec 09, 2013 6:28 pm Not sure!! It's an under coat because they reckon the acrylic render doesn't come in the colour , want, Mintaro slate, so they are going to paint over that render! It does look quite nice though building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 313Dec 10, 2013 10:20 pm Well hubby went up to the house and there was a lady inside cleaning, she was vacuming ready for the tilers to do the floors. Pavers were delivered and electrical finals done and all switched on! Light globes everywhere. building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 315Dec 10, 2013 10:39 pm Asj - yeah we are, we did think of doing it after handover but after thinking about it we decided to get it all done by redink. building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 316Dec 10, 2013 10:58 pm Cedes75 your house is looking amazing!! How exciting that you might have hand over at the end of next month! You must be so so excited to get into your brand new home! Re: Redink Trinity, todays work 317Dec 10, 2013 11:04 pm Wow everything looks fantastic. Love all your accent tiles. Re: Redink Trinity, todays work 318Dec 10, 2013 11:50 pm Rosienchrist & ardie514 - thanks!! It was a relief when you see the tiles and thank god that they do look ok!! It's really hard picking everything from a single tile as Im sure you've found out!! And yes can't wait to move in, it's been a long time, we signed with Redink September 2012 and didn't get to pre start till March 2013, I've enjoyed the ride (I did find the paperwork phase frustratingly long) and have nothing but great things to say about Redink. building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink Trinity, todays work 319Dec 12, 2013 9:50 pm Nothing happening at the house today building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71811 yes it does, you've just not understood it. theres a difference. 4 5322 Your house should come in "as new" condition. It should be clean, and without stains 1 4553 |