Browse Forums Building A New House Re: Bbank Gen 22 - Nearly there! 21Apr 08, 2013 7:58 pm I hope they fly through thr rest of the build for you!! We stopped by yesterday and found our front door wide open, so couldn't resist a quick peek, considering we haven't seen inside for several weeks. Splashbacks and electrical are done! It's all ready for the painter to touch up. Our door handle had been put on but it's off centre (it's a push door) so not too happy about that! And our curtains are on. It's all looking great and soo close to being finished. We were told site clean was done today too. Build Thread : Burbank Gen 22 Re: Burbank Generation 22 - PCI This Week! 22Apr 30, 2013 8:06 am PCI this week! Excited and nervous at the same time. We've picked up a few issues from the outside, mainly with the painting. Our door to the garage is still green tinged (might need another coat of paint?) and the painting on the window infills is not 100%, they missed spots but in others they painted over the windows. Our door, which we spent a small fortune upgrading, looks patchy and there is a mark on it (not from the wood stain) and internally they have painted over the glass. But everything else looks pretty good. We are happy with how it looks in general, will be interesting to see how we feel after PCI. Build Thread : Burbank Gen 22 Re: Burbank Generation 22 - PCI This Week! 23Apr 30, 2013 8:29 am Sometimes i wonder how much they actually give a crap. They seem to just rush so they can get paid quicker. I think they fail to realise that they need to come back and fix these things! haha Good luck with PCI, you should post some pics if you can bothered Re: Burbank Generation 22 - PCI This Week! 24Apr 30, 2013 8:56 am So true! This is from the front, as we haven't actually be allowed in there since they were painting it. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Build Thread : Burbank Gen 22 Re: Burbank Generation 22 - PCI This Week! 26Apr 30, 2013 1:21 pm How exciting! I bet you can't wait to get in there again and have a look around. Make sure you take some pics for us Tender /1/12 Contract 14/6/12 Planning 12/10/12 Site 23/10/12 Piers 27/11/12 Slab 12/12/12 Frame 15/12/12 Trusses 17/1/13 Roof 24/1/13 Bricks 13/2/13 Plaster 1/3/13 Re: Burbank Generation 22 - PCI This Week! 27May 01, 2013 8:20 am Thank you both! Yeah can't wait! Will probably run around for 10m like a crazy child before getting serious with PCI. One more sleep! Build Thread : Burbank Gen 22 Re: Burbank Generation 22 - Handover countdown has begun! 28May 03, 2013 1:23 pm PCI went smoothly! We came out of it feeling happy, which we were not expecting. Only issues were paint touch ups, which will be fixed, the toilet was running continuously and our bi-fold doors needed adjusting as they wouldn't open properly. Haven't got confirmation yet but handover is on the 16th! A couple of pics, although for the camera was having a bad day, so sorry that they are blurry. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Build Thread : Burbank Gen 22 Re: Burbank Generation 22 - Handover countdown has begun! 30May 03, 2013 6:20 pm house is looking amazing congrats on handover for 16th Hi All, Recently we have signed a contract with Burbank and we are not aware that they have just DORSET, SURREY, HAMPSHIRE, KENT, PILBARA and REDGUM bricks from PGH are… 0 3127 Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71773 yes it does, you've just not understood it. theres a difference. 4 5208 |