Browse Forums Building A New House 1 Dec 22, 2012 1:38 pm Make sure they zero'd your meter when installed. With all the solar PV installs they have an excess of used import-only meters that they are re-installing. Had case of neighbour's new build and power company installed a non zero'd second hand (looked new) meter. Slab poured 21/04/2011 Frame finished 27/05/2011 Moved in 07/11/2011 From a pure legal perspective, if you've signed the variation, it is a very high bar to have it set aside. No-one can give you legal advice on a forum, but you would need… 3 5473 Thanks. There are plenty of builders around my suburb. I'll make sure to do some door-to-door knocking, or note their building details on the temp fence. 4 4737 Building Standards; Getting It Right! Long story short, a toilet room is going to back onto our main bedroom and I want to make it close to soundproof. Im going to build two frames (pretty much a room within a… 0 10204 |