Browse Forums Building A New House Re: Boutique Homes 1190May 13, 2015 10:39 am Hi Donaldouk ... Saw you dilemma but as far as i know you can do changes till you do the signing of actual contracts. As we changed a lot in structural also and they just raise a post pwc variations and ask you and wife to sign and send them back Best of luck mate and am sur you will get them Re: Boutique Homes 1191May 13, 2015 12:02 pm They will charge you for any changes made after signing PWC: $1,000 for anything structural $500 for anything else That was 6 months ago, things may have changed, but after chatting with our pre-start consultant last week, I think they're becoming even more strict on changes as they are now building many more homes and don't currently have the man power behind the scenes. Re: Boutique Homes 1192May 13, 2015 12:12 pm As far as i know there are 3 stages 1. PWC ... Where they give you the quote of building with what you wanted( along with the paper work where you can choose the selection and add) 2. Colour and electrical selection 3. Actual contract signing Before colour selections and before the addenda is made i think we can add and delete. But after the colour selections whatever JP79 said like extra charge But this was the system when we did ours in august last year Things might have changed ONE MORE THING WE FACED DURING CONSTRUCTION IS ABOUT GETTING COOL WHITE OR WARM WHITE LIGHTS. It's better you mention you need cool white ( if that's the choice) during electrical selection as they are very reluctant to change it in later stages Re: Boutique Homes 1193May 13, 2015 5:15 pm Thanks for the replies guys. Had a email today from my consultant. He seem to think that I can add it at the colour selection. I get the feeling that he just trying to palm me off. No mention of cost. So got the nod of the boss (wife) that if I really want it. And will see at the colour selection. If we have to pay a fee other than the build cost then a shelf it is. Re: Boutique Homes 1196May 13, 2015 8:26 pm Donaldouk - you will lose 90mm from the room, not the shower itself if that helps. The shower will get shifted outwards away from the wall to accommodate for the extra 90mm. I'm in agreeance with Ashoka that they will charge you and yes, your consultant is definitely palming you off as he doesn't want the trouble of having to go through the change. I'd say if you want it then now is the time to act otherwise try your luck at colour selection but I have a feeling it will end badly. I can almost see the Pre-start Consultant saying "oh no girlfriend, that ain't happening, there's no structural changes at this late stage......" Re: Boutique Homes 1197May 13, 2015 8:43 pm Hi Donaldouk...we added the niche last min to our double shower during colour selection as it wasnt available to add in during the pwc process. We signed in 2013 and started building last August. We were charged admin fee $250 and niche $466. So worth it Re: Boutique Homes 1198May 13, 2015 8:55 pm We are just in the process of finalising our PWC. We have had our site costs calculated (about $4,500 over the initial estimate). We are building in Oakdene in Ocean Grove and have had the following factored in: - the corners of our lot just fall into the bushfire prone overlay meaning we are getting charged $5k for the bushfire provision. For a just over 600m2 block there would barely be 10m2 that is within the overlay. It is complete BS. Checking a few things out with the Council. - our site costs have factored in Coastal Protection (???) and also a high wind area. Has anyone come across this in this particular estate (or others)? The extra site costs and bushfire provisions have pushed this over our budget. Re: Boutique Homes 1199May 13, 2015 9:37 pm Theon thanks for that, I will pop in on sat to do some measurement. If I remember correctly with the Capri, the shower door is very close to the sink. shellzmac- I didn't see it in the upgrade options either, I only remembered after seeing others blog. Markso we are building in Oakdene too. Stage 6. Luckily we just missed the bush fire by one block. Had a quick skim through my PWC. Didn't see coastal protection and high wind listed on my site coast. Our site cost seem rather high at 14k...?!? Is that high? Re: Boutique Homes 1200May 13, 2015 9:46 pm Donaldouk Markso we are building in Oakdene too. Stage 6. Luckily we just missed the bush fire by one block. Had a quick skim through my PWC. Didn't see coastal protection and high wind listed on my site coast. Our site cost seem rather high at 14k...?!? Is that high? Thanks for that. Our site costs have come to $22k which makes yours seem rather low. Our lot is in stage 5 which is only 500m or so from the stage 6 listings. There's slight elevation in the stage 5 blocks but I wouldn't have thought it was $8k different. Will definitely follow this up. 10 16120 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 108719 |