Browse Forums Building A New House Re: What stuff are completed on Lockup and fixing?? 2Oct 05, 2012 4:39 pm Have a look at this link http://www.anewhouse.com.au/?p=232 about Lock Up The page will give links to the following stages of construction. Brian The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. Re: What stuff are completed on Lockup and fixing?? 3Oct 06, 2012 11:08 am Thanks bashworth I had a read through. that is very helpfull.If you could adviceat what stage the following work happens, that's really helpfull. I'm trying to see if my builder is going to complete the work before he asks for money. 1. Rendering 2. Electrical works 3. Benchtops 4. Fiber optics cabling 5. Evaporative cooler (heating unit is already installed) 6. Exhaust fans ( and ducting them to outside air) 7. paint Re: What stuff are completed on Lockup and fixing?? 4Oct 06, 2012 4:13 pm Initial cable installation for electrical and fibre optics is usually at fixing stage (before plasterboard. Everything else will be completion stage Although oven, cook top and extraction hood aren't usually installed until the handover day. The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. Any advice on a builder in NSW who is demanding an extra 22000k after the house is completed and contract paid in full .Standard HIA contract. Never received a variation.… 0 20515 Thanks for much mate. I see that you do cabinets before flooring. For timber flooring, for most parts it's fine because it's got base plates, and for door jabs you can… 7 11561 I'll look into different shower heads and ask the plumber about some engineering and see what he says. Thanks 2 9564 |