Had anyone had any problems with the site cut. The site cut seems to slope from the front to the back but the builder tells me it's level. Myself and someone else had looked at it and we both think it looks like it slopes down.
The slab gets poured on Friday and the builder tells me they have a building surveyor check also before the slab is poured, still can't help having reservations.