Browse Forums Building A New House Re: what is needed for bushfire assessment of 12.5 ? 21Sep 29, 2012 2:03 pm So is the house inspected to make sure all the BAL requirements have been carried out before handover by anyone. I have a feeling the ember screens listed in the BAL requirements for our weepers have not been installed to our house. cheers Block bought 1st RBC X! 2nd Ventrua,Keeper! Pstart 18/7/11 Ethwks jan 2012 Slab Bricks- finished 7/6 Roof Trusses 15/6-cbond 21/7 viewtopic.php?f=31&t=41185 Re: what is needed for bushfire assessment of 12.5 ? 22Oct 18, 2012 11:02 am I have no idea, but I would suspect that the council would in order to issue your certificate of occupancy, or am I being optimistic? Definitely you should look though, should say in your contact what you should have, I think ours mentions the mesh, but can't remember if it's 2 or 3mm gap max, should be obvious if it's missing! Just mention it to the builder and don't sign off on practical completion unless you are happy! 2 Re: what is needed for bushfire assessment of 12.5 ? 23Oct 18, 2012 11:21 am kerry-ann So is the house inspected to make sure all the BAL requirements have been carried out before handover by anyone. I have a feeling the ember screens listed in the BAL requirements for our weepers have not been installed to our house. cheers You should beable to see the screens in your weep holes we had a cpl missing that they picked up on in the final inspection that I had already mentioned to SS Site Cut 8/04/12 Slab 13/04/12 Frame 18/04/12 Roof 07/05/12 Lock Up 06/06/12 Keys 30/08/12 Re: what is needed for bushfire assessment of 12.5 ? 24Oct 18, 2012 11:34 am Mmmmm ok,i think i need to take a tourch with me,i did mention it to the SS & construction Manager & they did tell me something but with all the chitchat i have forgotten what they said. I think i remember that they said "we would not see it" could be wrong,i was assuming you would indeed see a mesh type stuff if you looked. It is in our paperwork lsited under BAL requirements. Cheers kat Block bought 1st RBC X! 2nd Ventrua,Keeper! Pstart 18/7/11 Ethwks jan 2012 Slab Bricks- finished 7/6 Roof Trusses 15/6-cbond 21/7 viewtopic.php?f=31&t=41185 Re: what is needed for bushfire assessment of 12.5 ? 25Oct 18, 2012 11:54 am I have just read my CC from the council and they have said that before OC the contractor is to provide certification that all measures required to achieve the level of construction required for the bushfire prone area. With that in mind, I would assume that they do not do an inspection. Modified Fernside 38 Rawson Homes Blog: http://www.thehousethatmatandjenbuilt.blogspot.com Build Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=60501 Re: what is needed for bushfire assessment of 12.5 ? 26Oct 19, 2012 2:19 pm Ok thanks for the info,i think i will ask the shire about it,they are pretty good i have found & their inspector is VERY good. cheers Block bought 1st RBC X! 2nd Ventrua,Keeper! Pstart 18/7/11 Ethwks jan 2012 Slab Bricks- finished 7/6 Roof Trusses 15/6-cbond 21/7 viewtopic.php?f=31&t=41185 Hi All, I engaged a tradie to install concrete retaining wall 600-800mm high over 32 meters in Victoria. Sleepers are 200*75*2000 mm installed over 17 steel posts. I… 0 6888 Building Standards; Getting It Right! Don't think they are designed for double brick. WA has a particular way of building and unfortunately that's the way a large amount of sills are finished. 3 6996 Any structural alteration to your home requires building permit. Before you get it you will have to supply plans with structural assessment, you will also be removing… 2 4085 |